Laserfiche WebLink
17. Enforcement Agency (EA) Conditions: <br /> a. The operator shall comply with all State Minimum Standards for solid waste handling and disposal as specified in Title 27 and/or <br /> 14), California Code of Regulations. <br /> b. The operator shall maintain a log of special/unusual occurrences. This log shall include, but is not limited to, fires, explosions, the <br /> discharge and disposition of hazardous or unpermitted wastes, and significant injuries, accidents or property damage. Each log entry <br /> shall be accompanied by a summary of any actions taken by the operator to mitigate the occurrence. The log shall be available to site <br /> personnel and the EA at all times. <br /> c. Additional information concerning the design and operation of the facility shall be furnished upon request and within the time frame <br /> specified by the EA. <br /> d. The maximum permitted daily tonnage for this facility is tons per day, and shall not receive more than this amount without <br /> a revision of this permit. (If applicable, include a statement regarding what counts toward the permitted tonnage.) <br /> e. This pen-nit is subject to review by the EA and may be temporarily suspended or revoked at any time by the EA for sufficient cause, <br /> in accordance with Division 30 of the Public Resource Code, Part 4, Chapter 4, Article 2, Sections 44305 et seq and associated <br /> regulations. <br /> f. The EA reserves the right to suspend or modify waste receiving and handling operations due to an emergency, a potential health <br /> hazard, or the creation of a public nuisance. <br /> g. Any change that would cause the design or operation of the facility not to conform to the terms and conditions of this permit is <br /> prohibited. Such a change may be considered a significant change, requiring a permit revision. In no case shall the operator <br /> implement any change without first submitting a written notice of the proposed change, in the form of an RFI amendment, to the EA <br /> at least 180 days in advance of the change. <br /> h. A copy of this permit shall be maintained at the facility. <br /> i. <br /> j <br /> k. <br /> Page 4 of 4 <br />