Laserfiche WebLink
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for ARCO AM PM #83333 as of January 15, 2026. <br /> Open violations from May 09, 2024 inspection <br /> Violation#7-2010003-Owner/Operator submitted DO form and/or informed the CUPA of any change(s) <br /> within 30 days(TCR 10). <br /> ACCELA TEST OBSERVATION:A new designated operator, [NAME], began conducting inspections on [DATE]and <br /> notification was not provided to the EHD within 30 days of the change. REGULATION GUIDANCE:The owner or <br /> operator shall submit a"Designated Underground Storage Tank Operator Identification Form"no later than 30 days <br /> after any change in the designated UST operator(s). CORRECTIVE ACTION: Immediately log into the California <br /> Environmental Reporting System (CERS)at http://cers.calepa.ca.gov and upload the notification identifying all the <br /> designated operators for this facility. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#9-2030002-Leak detection equipment tested by qualified service technician every 12 months <br /> (TCR 9d). <br /> ACCELA TEST OBSERVATION:Annual monitoring system certification and leak detector testing were previously <br /> performed on [DATE]and was completed on [DATE], [#MONTHS LATE] months past due. REGULATION <br /> GUIDANCE:These tests are required once every 12 months. CORRECTIVE ACTION:Take all necessary <br /> precautions to ensure testing is performed in a timely manner. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#11 -2030048-Sec containment testing conducted per requirements&records kept for 36 mths <br /> (TCR 9d). <br /> ACCELATEST OBSERVATION: [NOTE WHICH SECONDARY CONTAINMENT COMPONENT]was installed on <br /> [DATE] and six month testing was due by[MONTH/YEAR]. Testing has not been completed and is [#OF MONTHS] <br /> months past due. REGULATION GUIDANCE: Secondary containment testing is required to be performed six <br /> months after installation and at least every 36 months after. CORRECTIVE ACTION: Immediately schedule this <br /> test and provide 48 hours notification to the EHD. <br /> Page 2 of 3 <br />