Laserfiche WebLink
a <br /> Daily Tank Inspection Checklist <br /> Date:� <br /> 0:�— <br /> ro2 " <br /> Name of Inspector: a,G(M Time: �` <br /> "This inspection includes all aboveground storage tanks at the RMF. Any defects noted will be described <br /> in the observations section below. <br /> Yes No <br /> 1. Are there signs of corrosion or leakage? x <br /> . Tank Exterior? x <br /> F Inlet piping/valves/connections?• x <br /> outlet piping/valves/connections? <br /> 2. Is the equipment not working? <br /> inlet valves and connections? <br /> . outlet valves and connections? <br /> . High level waste feed cut-off? <br /> Leak detection system? <br /> 3. Is the secondary containment cracked or deteriorated? <br /> IA 4. Does the secondary containment have accumulated liquids? <br /> `V S. Is the tank labeled with: <br /> Words Hazardous Waste? <br /> • Date of Accumulation? <br /> E. Is HW in tank not compatible with tank material? <br /> 7. Is HW stored in tanks more than 90 days from the date of accumulation? <br /> 8. Is there less than 2 feet of freeboard on open tanks? N/A N/A <br /> 9. Are there pumps or values associated with volatile organic compounds that are not N/A N/A <br /> vapor tight? <br /> Describe any observations for the items checked Yes (include name of tank): <br /> Corrective action required: <br /> !r <br /> Due Date: / / Person Assigned: <br /> Completed By: <br /> Follow-up Date: / / <br />