Laserfiche WebLink
OO R.R.1pOR gapHERZOG <br /> Daily Tank Inspection Checklist <br /> Name of Inspector: � � ? <br /> Date:LlC/ / Time: 07,J 0 <br /> *This inspection includes all aboveground storage tanks at the RMF. Any defects noted will be described <br /> in the observations section below. <br /> 1• Are there signs of corrosion or leakage? Yes No <br /> • Tank Exterior? <br /> • Inlet piping/valves/connections? <br /> • Outlet piping/valves/connections? <br /> 2• is the equipment not working? <br /> • Inlet valves and connections? <br /> • Outlet valves and connections? <br /> • High level waste feed cut-off? <br /> • Leak detection system? <br /> 3. Is the secondary containment cracked or deteriorated? <br /> 4. Does the secondary containment have accumulated liquids? <br /> r++r 5. Is the tank labeled with: <br />. • Words Hazardous Waste? <br /> • Date of Accumulation? <br /> 6. Is HW in tank not compatible with tank material? <br /> 7. Is HW stored in tanks more than 90 days from the date of accumulation? <br /> 8. Is there less than 2 feet of freeboard on open tanks? N/A N/A <br /> 9. Are there pumps or values associated with volatile organic compounds that are not N/A N/A <br /> vapor tight? <br /> Describe any observations for the items checked Yes (include name of tank): <br /> Corrective action required: <br /> Due Date: _ <br /> Person Assigned: <br /> / �- <br /> Completed By: <br /> Follow-up Date: _/ / <br />