My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1744
>
2900 - Site Mitigation Program
>
PR0542458
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2026 12:59:37 PM
Creation date
1/26/2026 12:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542458
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024399
FACILITY_NAME
PARKWOODS CLEANERS
STREET_NUMBER
1744
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
07728032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
1744 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec® <br /> consultants <br /> Samples will be selected to represent each distinct geologic layer. The number of samples to be <br /> collected will be determined by the geologist after inspection of the soil core and consideration <br /> of the degree of heterogeneity in the geologic materials. <br /> 2.5 Soil Gas Probe Installation <br /> Each soil gas probe will consist of 1/4-inch diameter Nylaflow® or Teflon® tubing connected <br /> with a compression fitting to a 1/4-inch-diameter stainless steel sampling point. Probes will be <br /> installed inside the borehole and a sand filter pack will be placed in the annulus to a height of 6 <br /> inches above the top of the screen. Granular bentonite will be placed in two lifts of 3 inches <br /> above the filter pack and hydrated with a small amount of distilled water after each lift. A thick <br /> slurry of powdered bentonite and water will be added to seal the remainder of the borehole <br /> annulus to ground surface. The top of the probe will be fitted with a compression-fit brass or <br /> stainless steel ball valve to maintain an air-tight seal between installation and sampling. <br /> Permanent probes will be completed with a traffic rated flush mount protective casing. <br /> 3 DOCUMENTATION <br /> Field documentation will include the following information: <br /> • name and number of project; <br /> • name of field personnel; <br /> • date and time of sampling event; <br /> • list of the primary activities performed; <br /> • identification of probes drilled and installed; <br /> • relevant information (weather, attendees, equipment problems, departures from <br /> standard procedures and the reasons and responses) observed throughout the day; <br /> • field instrument information and calibration data (includes time and reading for <br /> each instrument calibration check; and <br /> • volume of probe dead space volume for each soil gas probe. <br /> 2 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.