My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2026 1:42:57 PM
Creation date
1/29/2026 3:40:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231021
PE
2361 - UST FACILITY
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
2908 W BENJAMIN HOLT DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ftrt ate riaEs 10 Series Emergency <br /> Top:Cast iron tow Profile Patented Thermal Shut-Off Valves <br /> Relief Valve OPW 10 Series Emergency Shut-off <br /> _ _Body_Cast iron 9 ry <br /> Disc:M-19 Main rUILValves are installed on fuel supply <br /> Poppet secondary lines beneath dispensers at grade level <br /> Carrier:Zinc-plated steel Seat ,."� ' Poppet to minimize hazards associated with <br /> Stem:Copper-nickel-chrome-plated brass Fusible <br /> link collision or fire at the dispenser.If the <br /> Poppet Spring:Stainless steel dispenser is pulled over or dislodged by <br /> Seal:M-19 0-Ring collision,the top of the valve breaks off <br /> Packingnut:Brass, Nickel-Plated, <br /> 'Teflon-coated at the integral shear groove,activating <br /> Inlet and outlet thread:1-112" (4 cm) NPT Main stem poppets and shutting off the flow of fuel. <br /> (British threads available) Single-poppet models shut off supply <br /> *With black Duragard®E-Coating Combination Main Poppet Body flow,while double-poppet models shut <br /> off supply as well as prevent release <br /> Features of fuel from the dispenser's internal <br /> ♦ High Flow Capacity—the primary ♦ Integral Test Port—a 318" (9.5 mm) piping.The base of the emergency valve <br /> poppet is held out of the flow stream test port allows the piping system to be is securely anchored to the concrete <br /> while the secondary poppet is held air-tested without breaking any piping <br /> normally open to minimize head loss connections. dispenser island through a stabilizer bar <br /> across the valve and to protect the poppet 40� Patented Thermal Relief Valve— system within the dispenser sump or pan <br /> seals from damage and erosion.True relieves excessive pressure over 25 psi to ensure proper shearing action.The <br /> 1-112" (4 cm)and 2" (5 cm)body sizes caused by thermal expansion of fuel in the valve base is secured to the stabilizer <br /> ensure maximum flow. dispenser piping system in the event of bar using a three-point boss mount <br /> Fire Protection—a fusible link trips fire(double-poppet models only). system or a U-Bolt Kit(not included) <br /> the valve closed at 165"F to shut off fuel ♦ Low-Profile Tops—female and union- 1 OUBK-015(1-112")and 10URK- <br /> supply to the dispenser. top double-poppet valves have a low- <br /> • Main Poppet Seat Integral to the 0200(2 sold separately).Valve inlet <br /> pp g profile top to allow upgrading from DPW <br /> Top Assembly—having the main poppet single-poppet valves without changing (bottom)connections are female pipe <br /> seat as an integral part of the valve top existing piping. threads and outlet(top) connections <br /> ensures a new,clean seating surface is ♦ Multiple Mounting Options—valves are available with female threads,male <br /> installed each time the top is replaced. are boss-mounted to stabilizer bars in threads or a union fitting.Other options <br /> This design also ensures that the integrity sumps and pans or mounted to bars include suction system models with a <br /> of the seal between the valve top and embedded in the island with optional <br /> bottom is verified during line testing and normally closed Secondary poppet which <br /> U-Bolt kits 10UBK-015(not included). . <br /> allows full inspection of the main poppet maintains prime,and models <br /> when the top is removed. Versatile Combination Body(boss mount/ with external threads on the inlet <br /> U-Bolt mount)models are available to <br /> s Duragard®-Coat Finish—provides accommodate most mounting applications body which connect to secondary <br /> superior corrosion resistance. with one valve style, containment systems. <br /> ♦ Reliable Shut-off—a stainless steel ♦ Underwriters Laboratories— VL <br /> main spring,a teflon-coated brass packing listed for use with gasoline and 85%and <br /> nut and a copper/nickel/chrome-plated 100%methanol.All DPW 10 Emergency <br /> brass stem are designed to prevent tar Shut-Off Valves meet requirements of UL <br /> build-up and corrosion from interfering STANDARD 842. <br /> with poppet operation after long periods ♦ Compatible with 85%ethanol(E85) <br /> of normal service without activation. <br /> PAIS Offset Adaptor Ordering Specifications <br /> The OPW PA15 Offset Adaptor Part q Thread Size Offset Height Width Body Weight <br /> is designed for adjusting in, mm in. min in. mm in. mm lb. kg <br /> misalignment of pipe in PA15-10 P/: 38.1 1 'S 25 VA 57.2 3/e 92.1 2 .9 <br /> dispenser sumps and suction dp PA15-15 11h ° 38.1 11h 38.1 21/4 57.2 41h 104.8 2 .9 <br /> stubs.The PA15 has a low Materials <br /> profile feature,and is designed PAT 5-20 Ph } 38.1 2 '51 VA 57.2 45/e "117.5 2 9 <br /> Ductile Iron <br /> for maximum flow. Black Duragard <br /> E-Coating <br /> DEFINING I WHAT'S <br />
The URL can be used to link to this page
Your browser does not support the video tag.