Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Testing Report Form <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Test Method Developed by ❑ Manufacturer V Industry Standard ❑ Professional Engineer <br /> L) Check this box if Appendix 7.1 continuation page is attached. <br /> Tank ID (one OPE per column) T1: Regular T2: Premium T3: Diesel <br /> Tank Manufacturer XERXES XERXES XERXES <br /> Tank Capacity (Gallons) 10369 10369 10369 <br /> Tank Inside Diameter (inches) 117.75 117.75 117.75 <br /> Are both vent and tank riser piping 21 yes V yes V Yes ❑ Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Manufacturer! Model opw opw opw <br /> What is the OPE response when activated? ® Shut off A Shut off Z Shut off ❑ Shut off <br /> (Check all that apply.) ❑ Restrict J Restrict ❑ Restrict ❑ Restrict <br /> ❑Audible 0 Audible ❑ Audible ❑ Audible <br /> Visual ❑ Visual ❑ Visual ❑ Visual <br /> Are flow restictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? No Z No Z No ❑ No <br /> For aud1blelvisual overfill alarms, are they C✓J Yes ❑✓ Yes ✓❑ Yes ❑ Yes <br /> clearly .audiblelvisible at the tank fill point? LJ No LJ No LJ No LJ No <br /> At what level in the tank does the OPE 102.375 97 <br /> activate? (inches from bottom of tank) <br /> What is the percent capacity of the tank at 93.5 89.6 <br /> which the OPE activates? _ <br /> Is the OPE in proper operating condition to Yes Yes Yes ❑ Yes <br /> respond when the stored substance reaches <br /> the desi nated re ulato level? A No ❑ No ❑ No ❑ No <br /> 7. SUMMARY OF TEST RESULTS <br /> OPE Test Results ❑ Pass V Pass V Pass ❑ Pass <br /> 0 Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Was not able to test REG. Drop tube do to being seized and needing sec. man,was called into the office <br /> * ❑Check this box if flow restrictors interfere with overfill prevention and repairs are required. <br /> All tests marked `'Fail" and any repairs made during the test must be described in Section 8. <br /> Attach tank chart(s), measurements, calculations; and Ira-Tank Setup report(s) Page 2 of 2 <br />