My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3202
>
2300 - Underground Storage Tank Program
>
PR0231129
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:19:48 PM
Creation date
2/2/2026 11:21:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231129
PE
2361 - UST FACILITY
FACILITY_ID
FA0001817
FACILITY_NAME
7-ELEVEN INC #35355
STREET_NUMBER
3202
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3202 W HAMMER LN STOCKTON 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13. DIMPU F1FtST HOLE STIEP IS: DtMP LE REMAINING HOLD <br /> kerrmove tool. Remove any chips or burrs from ttke d rill- Remove any ch 1ps Dr burrs ftwn the drilil l r+g operatbn. <br /> ing operation. Place the assem bly on a solid surface. Di mole the next( )Moles as done in Step 13. Make su re <br /> Using the punch suppliied v6th the 71 SO-TOOL, 715O- the assembly Is on a solid surface when punch~rxg- After <br /> T0(XC,and 71SO-TOOLCf, align the tip of the pund3 punching,irenv"any chips that may haw fallen into <br /> with z�w drgkd hak and d1m9le tiles upp& drop tube by the 0 m tube snow hole. <br /> striking the punch with a hammer until ch+edrop tube is <br /> formed kvto countersunk hole in the inlet tube. After <br /> purdhing, mmove any chips that may have fallen into <br /> the ink-t Cube screw hofe- <br /> Align punch with <br /> drilled i <br /> ---- A <br /> Figure 15 <br /> * STEP 16: ASSEMBLE OTHER SCAEM <br /> Apply bhwk molt'grease to screws a rxd tighten the oth- <br /> er(2)screws into in let-tube with a screweldwr as-done <br /> Fr`grrrr 73 In Step 1 it. Use only the Mpbte screws that are supplied <br /> +rwizh Lhe ynm Searing torque Is 20 in Abs rslim to 35 in.- <br /> STEP 14: ASSEMBLE IFI RST SCREW lbs max, DD not over Vghte ri. <br /> Ensure that the drop tube was farmed Into the couu nter- <br /> sunk screw We as shown In Figure 14 If W return to S71P 17: APPLY GREASE TO LOWER D-#iMG AND <br /> Step 13. Apply black maly grease to screw and irigtrterw BODY THREADS <br /> first screw inty Inlet tube w41•h a screwdriver. Use only Apply black Poly grease to the lower tube e-ring and <br /> the taptite screws that are supplied with d,.e unit Seat- body t hreads as shown. MAw sum coverage i5 corm <br /> ir,9 torque Is 24 in-ibs min,to 3S in-lbs wx- Screw head pletely around the o-ring. In5Wll a-rirn9 in gnxhe just <br /> should be flush with*we drop tube, Vo not over tlght- ab['w threads, <br /> en. <br /> + F'Ph►4rease <br /> } around-.clog <br /> Yam_ <br /> e�we4aoQ.�ra�..s iao <br /> O ir+g <br /> Frn'ei4 groove iiaeyrt-r�e�a�s�. _..-- <br /> Figum 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.