Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8, CONTAINMENT SUMP AND UDC TEST <br /> Test Method Develcped by C] Manufacturer 191 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum I® Hydrostatic <br /> Test Equipment Used: <br /> ❑ Check this box if Appendix 8.3 continuation page is attached. <br /> Sump/UDC ID D L 1 STP <br /> Sump Manufacturer unknown <br /> Sump Depth (inches) unknown <br /> Sump Bottom to Top of unknown <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time 9:39 <br /> Initial Reading 5.0004 <br /> Test End Time 9:54 <br /> Final Reading 5.0007 <br /> Change in Reading 0.000 <br /> Pass/Fail Criteria 0,002 0.002 0.002 0.002 <br /> Tightness Test Results 0 Pass 0 Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Continuity Test Results ® Pass ❑ Fail ❑ Pass q Fail ❑ Pass ❑ Fail 1J Pass C1 Bail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> inches <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria 0.002 0.002 0.00 ~0.00 <br /> Tightness Test Results ❑ Pass ❑ Fail Q Pass ❑ Fail ❑ Pass Q Fail ❑ Pass Q Fail <br /> Continuity Test Results ❑ Pass ❑ Fail ❑ Pass 0 Fail ❑ Pass ❑ Fail 0 Pass 0 Fail <br /> Describe ire Section 9 ail tests marked "Fart" arrd any repairs made during the test. Page 3 of 4 <br />