Laserfiche WebLink
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 6. SENSOR TEST RESULTS <br /> ❑ Check this box if Appendix 5.1 continuation page is attached. <br /> List only sensors tested. List "Sensor ID"as labeled in system programming. For VPH monitoring, <br /> continuity must be confirmed between the most distant points in the interstitial space to the extent <br /> practical as approved by the Unified Program Agency and the sensor that monitors the zone. <br /> Sensor Sensor Function Continuity <br /> ID Model Component(s) Monitored Pass Fail Pass Fail NA <br /> L -1 2 0 8 DISPENSER 1 / 2 0 ❑ ❑ ❑ ❑ <br /> L - 2 2 0 8 DISPENSER 3 / 4 0 ❑ ❑ ❑ ❑ <br /> L - 3 2 0 8 DISPENSER 5 / 6 0 ❑ ❑ ❑ ❑ <br /> L - 4 2 0 8 DISPENSER 7 / 8 0 ❑ ❑ ❑ ❑ <br /> L - 5 2 0 8 DISPENSER 9 / 10 0 ❑ ❑ ❑ ❑ <br /> L - 6 2 0 8 91 OCTANE STP SUMP 0 ❑ ❑ ❑ ❑ <br /> L - 7 2 0 8 DIESEL STP SUMP 0 ❑ ❑ ❑ ❑ <br /> L - 8 2 0 8 87 OCTANE S T P SUMP 0 ❑ ❑ ❑ ❑ <br /> L - 9 4 0 9 91 OCTANE / DIESEL ANNULAR SPACE 0 ❑ ❑ ❑ ❑ <br /> L - 10 4 0 9 87 OCTANE ANNULAR SPACE 0 ❑ ❑ ❑ ❑ <br /> L - 11 2 0 8 87 OCTANE FILL SUMP 0 ❑ ❑ ❑ ❑ <br /> L - 12 2 0 8 DIESEL FILL SUMP 0 ❑ ❑ ❑ ❑ <br /> L - 13 2 0 8 91 OCTANE FILL SUMP 0 ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ <br /> Describe all answers marked "No"or "Fail"and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 3 of 6 <br />