Laserfiche WebLink
'7,��,y <br /> G G <br />.-C' o <br /> lor <br /> St Wastew e g Sheet <br /> Stockton, CA <br /> O'r y p'G <br /> 0. FIRST SHIFT WASTEWATER System Start Time System Stop Time Total Run Time hrs <br /> w� Dace• G Coagulant Clay Flo culant DAF System Checks Effluent Evaluation <br /> • o <br /> Process Eo Unifom,Eo clay arlty Solids process Final <br />�0 T Operator Tank Level Tank Level System Flow Coagulant Dosage Coagulant Feetl Coagulant Ald Clay Feetl Flocculent Dosage Flocculent Fees Plansc/mFlow Prelssure1f(p ( g g (None,Slight, <br /> y Time trite s Rate(gpm) Seeing rial,fml/Mtn) Rale (mgmin) Setting Ratefml/min) ( ) Ipc) Wed eReadin PH PH <br /> (Feet) IFeey Dosage Setting -46 <br /> r <br />�Q <br /> H Probe Validation <br /> Daily Inventory Analysis Water Processing p Number of Bags ol Clay Used <br /> r� P Prod. S _,—End Gal Used Meter.Start Meter End Vol Treated Process pH In Line Tested High and Low pH Alarms <br /> / p C� <br />'01 ` Coag / Process / Process H Hand Heltl L or R Redre Pump being used <br /> t / Final pH In Line - pH meters cleaned I calibrated <br /> Cla Uniform, / <br /> Polymer Final pH Hand Held Date of pH probe cleaned <br /> Blowdown Done This Morning <br /> // <br /> Jar Study Results in PPM - Notes Agency visits,Samples collected,Start I Stop of Sampler,Sludge Hauls,Equipment Failures I Repair I Chemical Delivery Any Alarms or Errors Observed <br /> • Was Skimmer Run At End o1 Day n <br /> Time Coag Clay I Floc Clarity - <br /> r <br /> Are Flow Meters Oper Correctly <br /> Proper Dissolved Air Observed <br /> i <br /> f G <br /> C iUsersMll19060iDccuments1iWastewater Daily Log Bill's <br />