My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
950
>
2900 - Site Mitigation Program
>
PR0547725
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:52:31 PM
Creation date
2/17/2026 11:14:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0547725
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027181
FACILITY_NAME
PROPOSED MONITORING WELL SITE
STREET_NUMBER
950
STREET_NAME
STEWART
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
2121007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
950 STEWART RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1. Proposed Well Construction <br /> Monitoring Zone Screen Interval (feet bgs) Gravel Pack(feet bgs) <br /> Zone 1 1000-1010 990-1020 <br /> Zone 2 1150-1160 1140-1170 <br /> Sealing Method <br /> The upper 150 feet will be sealed with a surly of sand-cement.The grout shall consist of a sand-cement <br /> mixture in accordance with California Department of water Resources well standards, Bulletin 74- <br /> 81/Supplement 74-90. The area between the surface seal and the monitoring zone will be sealed with a <br /> bentonite grout or bentonite pellets.The sealing material shall be a graded chip between % inch to 3/8 <br /> inch.An approved product for the bentonite chip seals is "HOLEPLUG", and for the bentonite grout <br /> "QUICK-GROUT" both manufactured by the NIL Baroid Division of NIL Industries, Inc.Technical data <br /> including the recommended mixing procedure for these products are included in Attachment D. <br /> Method of Destruction <br /> In the event the monitoring well must be destroyed,two proposed well destruction plans by method of <br /> detonation which were provided by Tylor McMillan's Well Service, LLC for TW1 is included in <br /> Attachment E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.