My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
950
>
2900 - Site Mitigation Program
>
PR0547725
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 2:52:31 PM
Creation date
2/17/2026 11:14:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0547725
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0027181
FACILITY_NAME
PROPOSED MONITORING WELL SITE
STREET_NUMBER
950
STREET_NAME
STEWART
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
2121007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
950 STEWART RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
285
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tylor McMillan's Well Service <br /> 9530 Hageman Rd. STE B#349 Bakersfield CA,93312 <br /> Phone: (916)761-5224 Email:mcmillans521(a-)amail.com <br /> Website:www.wellblaster.com <br /> Date: May 31,2022 <br /> BLASTING WORK PLAN <br /> Well:L&S Proposed MW Design Location: City of Lathrop Plan date and time: Pending <br /> Casing 2-inch ID PVC to 235 feet <br /> Casing 2-inch ID PVC to 410 feet <br /> Casing 2-inch ID PVC to 650 feet <br /> 4 Sealing pipe Boosters <br /> GL Density g/cc 1.55 g/cc <br /> Detonation Velocity 24,000 ft/s 7,315 m/s <br /> Casing Diameter 2 inches <br /> Charge Wt. 0.15 Kg 150 grams <br /> 100, Detonation pressure 207 k/bar <br /> Total energy ea. 13,997 k/bar <br /> Pressure at casing 3,341.48 k/bar 50,018,545 psi <br /> Detonator placed at 150 feet pressure at 10 feet 0.00 29 psi <br /> Detonating Cord <br /> 200' Start 150 feet Explosive Cord <br /> Intervals Linear Density g/cc 1.60 g/cc <br /> End 650 feet Detonation Velocity 22,000 ft/s 6,706 m/s <br /> Strength 100 grain Casing Diameter 2 inches <br /> Total 500 feet Grains 100 gr/ft 6.48 g/ft <br /> 300' <br /> Detonation pressure 180 k/bar <br /> Total energy pef ft. 44 k/bar <br /> Pressure at casing 13.91 k/bar 208,249 psi <br /> *These are estimated pressure for a empty well <br /> 400' Site procedure <br /> 1. Check site and measure well depth <br /> 2. Clear work site of all unessential personal <br /> 3. Lower charges and drop pipe into the well <br /> 4. Pump sealing material to top of well <br /> 5. Check and clear blast area(sound blast warning) <br /> 500' 6. Arm explosives <br /> 7. Confirm area clear(final blast warning) <br /> 8. Detonate charge <br /> 9. Check hole and sound all clear <br /> 10. Refill cement to top of well to form a mushroom cap <br /> 600' <br /> Ljj <br /> Name of Blaster Preparing Plan: Tylor McMillan <br /> 700' Total Explosives *Tylor McMillan's Well Service reserves the right to change or modify the charge in <br /> 7 lbs. any way necessary to maintain the safety of all personnel onsite and in surrounding <br /> areas. <br /> 800' <br /> 900, <br />
The URL can be used to link to this page
Your browser does not support the video tag.