My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
3138
>
2900 - Site Mitigation Program
>
PR0536580
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 1:28:43 PM
Creation date
2/17/2026 1:14:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0536580
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0021000
FACILITY_NAME
HUNTBROOK HOLDINGS LLC
STREET_NUMBER
3138
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15710403
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3138 E MAIN ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jeff Wong <br />San Joaquin County Environmental Health Department <br />May 8, 2023 <br />Page 5 <br />• TPHg by EPA Method 8015M; <br />• TPHmo by EPA Method 8015M; <br />• Semi -VOCs by EPA Method 8270C; <br />• PCBs by EPA Method 8082; and <br />• LUFT 5 Metals (cadmium, chromium, lead, nickel, and zinc) using EPA Method 6010. <br />Following evaluation of disposal options, the water will be hauled off-site to an appropriately licensed <br />disposal facility. A copy of the disposal manifest or bill of lading will be included in RDM's well <br />destruction report. <br />Construction debris (asphalt, concrete and well boxes) generated during the well destructions will be <br />hauled to a local recycling facility or landfill for disposal. <br />Reporting <br />Following completion of the work, RDM will submit a results report to the CVRWQCB to document that <br />well destructions and disposal of any investigation -derived waste were completed so that the site can be <br />granted "final" closure. In addition, DWR Well Completion Reports (DWR Form 188) will be submitted <br />to the DWR and SJCEHD for each destroyed well. <br />Schedule <br />The proposed scope of work will be initiated within 30 days of receiving the CVRWQCB's written <br />approval of this work plan and the SJCEHD's issuance of the drilling permits. RDM will submit a report <br />summarizing the well destruction and site restoration activities to the CVRWQCB and the SJCEHD (if <br />requested), and RDM or the driller will prepare and submit the DWR well completion reports to the <br />SJCEHD and the DWR within 45 days following completion of the work. <br />Remarks/Signatures <br />The interpretations contained in this document represent our professional opinions, and are based in part, <br />on information supplied by the client. These opinions are based on currently available information and <br />are arrived at in accordance with currently accepted hydrogeologic and engineering practices at this time <br />and location. Other than this, no warranty is implied or intended. <br />
The URL can be used to link to this page
Your browser does not support the video tag.