My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
701
>
2900 - Site Mitigation Program
>
PR0529434
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:14:55 PM
Creation date
2/17/2026 2:01:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0529434
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0019555
FACILITY_NAME
SOUTH POINTE DEVELOPMENT SITE (CITY OF STKN REDEVELOPMENT AGENCY)
STREET_NUMBER
701
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95202
APN
13726016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
701 W WEBER AVE STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® Stantec Risk Management Strategy (RMS1 ) <br /> that they must have the equipment required to work safely,they must verify the equipment is in working order, and that they have the <br /> knowledge required to operate/use the equipment. Q <br /> Prepared by: Neil Doran 1/17/2023 <br /> Print Name Signature Date <br /> Reviewed by: _ <br /> (not author) Corinne Ackerman – - –�} 1/17/2023 <br /> Print Name Signature u Date <br /> Approved by PM: Neil Doran MI 1/17/2023 <br /> Print Name Signature Date <br /> Employee Review <br /> All employees conducting field work on this project will review the Risk Management Strategy(RMS1)and sign below acknowledging <br /> that they have been advised of the hazards, controls, PPE, and other safety equipment required, and have reviewed the applicable <br /> SWPs. Employees in the field who identify additional hazards not listed above will notify the project manager of the hazard, and prior to <br /> proceeding,will confirm the controls that will be used. Document any on-site changes and communications using the RMS2 as <br /> appropriate; see section 4.5 of the HSSE Program Manual on Management of Change. <br /> Please designate Team Lead for field activities below. <br /> Reviewed by: Click here to enter text. Click here to enter a <br /> date. <br /> Print Name Signature Date <br /> (Team Lead Field) <br /> Click here to enter text. Click here to enter a <br /> date. <br /> Print Name Signature Date <br /> Click here to enter text. Click here to enter a <br /> date. <br /> Print Name Signature Date <br /> Click here to enter text. Click here to enter a <br /> date. <br /> Print Name Signature Date <br /> Click here to enter text. Click here to enter a <br /> date. <br /> Print Name Signature Date <br /> Last Updated:July 2022 Document Owner:HSSE <br /> Printed copy uncontrolled-current version on The Lens Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.