<br />3-15 <br /> <br />Item RS Means Cost Code # <br />/ Other Cost Source <br />RS Means Cost Code / Other Source <br />Description Unit Unit <br />Price Quantiy Total Cost Assumptions / Quantity Takeoffs <br />APTIM Cost 2025 <br />(other similar project)Equipment mob / demob costs (site setup, trailer, etc.) Lump Sum $ 45,000 1 $ 45,000 <br /> $ 45,000 <br />31 23 16 42 0305 <br />Excavating, bulk bank measure, 3-1/2 C.Y. capacity = 300 <br />C.Y./hour, backhoe, hydraulic, crawler mounted, excluding truck <br />loading <br />CY $ 1.59 12,074 $ 19,198 <br />31 23 23 20 4014 <br />Cycle hauling (wait, load, travel, unload or dump & return) time per <br />cycle, excavated or borrow, loose cubic yards, 15 min <br />load/wait/unload, 20 C.Y. truck, cycle 0.5 mile, 15 MPH, excludes <br />loading equipment <br />CY $ 2.82 12,074 $ 34,049 <br />31 23 23 17 0020 Fill, dumped material, spread, by dozer, excludes compaction CY $ 2.79 12,074 $ 33,686 <br />31 22 16 10 3300 Fine grading, slopes, gentle, finish grading SY $ 0.30 72,439 $ 21,732 <br />02 21 13 09 0020 Topographical survey, conventional, minimum Acre $ 803.80 15 $ 12,057 <br /> $ 120,722 <br />31 23 16 42 0305 <br />Excavating, bulk bank measure, 3-1/2 C.Y. capacity = 300 <br />C.Y./hour, backhoe, hydraulic, crawler mounted, excluding truck <br />loading <br />CY $ 1.59 54,370 $ 86,448 <br />31 23 23 20 4014 <br />Cycle hauling(wait, load, travel, unload or dump & return) time per <br />cycle, excavated or borrow, loose cubic yards, 15 min <br />load/wait/unload, 20 C.Y. truck, cycle 0.5 mile, 15 MPH, excludes <br />loading equipment <br />CY $ 2.82 54,370 $ 153,323 <br />31 23 23 17 0020 Fill, dumped material, spread, by dozer, excludes compaction CY $ 2.79 54,370 $ 151,692 <br />31 22 16 10 1020 Fine grading, loam or topsoil fine grade for large area, 15,000 S.Y. <br />or more SY $ 1.51 326,216 $ 492,586 <br />02 21 13 09 0020 Topographical survey, conventional, minimum Acre $ 803.80 67.40 $ 54,176 <br />32 92 19 14 4600 Seeding athletic fields, seeding slope mix with mulch and fertilizer, <br />6 lb. per M.S.F., hydro or air seeding MSF $ 90.40 2,936.00 $ 265,414 <br /> $ 1,203,641 <br /> $ 1,369,362 <br />ITEM 4: <br />Project Management & CQA <br />Oversight / Documentation <br />APTIM Cost 2025 <br />(other similar project) <br />Project Management & CQA Oversight / Documentation (15% of <br />Subtotal)- -15% of <br />Subtotal - - $ 205,410 <br /> $ 1,574,772 ITEMS 1อด4 TOTAL COST: <br />Table 2 <br />Foothill Sanitary Landfill <br />2025 NWRCAP Cost Estimate for Repair of Final Cover and Drainage System <br />Impacted by Precipitation Causal Event <br />RS Means 2025 CostWorks (CA Union Rates) / Other Source <br />ITEM 1: <br />Site Mob / Demob <br />ITEM 1 - Total: <br />ITEM 2: <br />Repair of Drainage System - <br />Basins and Perimeter Ditch <br />ITEM 2 - Total: <br />ITEM 3: <br />Repair of Final Cover System - <br />Top 1-Foot ET Soil Layer and <br />Seeding and Mulch <br />Drainage Assumptions: Repairs assume clearing material from the ditches and basins, erosion repair, <br />minor grading, and surveying. Assumed the ditch and basin areas will require repair to a depth of 1-foot, by <br />excavating sediment fill down to original grades and / or filling in areas where erosion occured. Assumed 1/2 <br />of the repair area will require excavation and 1/2 of the repair area will require fill. <br />Perimeter Drainage Ditch: <br />Total Ditch Length = L = 10,745 feet (ft) <br />Assumed Average Ditch Width = W = 10 ft <br />Surface Area = (L x W) = (10,745 ft) x (10 ft) = 107,450 sf = (107,450 sf) x (1 sq.yd / 9 sf) = 11,939 sy <br /> = (107,450 sf) x (1 acre / 43,560 sf) = 2.5 acres <br />Sediment / Erosion Volume = (11,939 sy) x [(1-ft depth) x (1 yd / 3-ft)] = 3,980 cy <br />Basin Area: <br />Basin 1 Area = 8.5 acres / Basin 2 Area = 1.5 acres / Basin 3 Area = 2.5 acres <br />Total Basin Area = (8.5 ac + 1.5 ac + 2.5 ac) = 12.5 acres = (12.5 acres) x (43,560 sf / 1 acre) = 544,500 sf <br /> = (544,500 sf) x (1 sy / 9 sf) = 60,500 sy <br />Sediment / Erosion Volume = (60,500 sy) x [(1-ft depth) x (1 yd / 3-ft)] = 20,167 cy <br />Repair Volumes: <br />Total Repair Volume = (3,980 cy + 20,167 cy) = 24,147 cy <br />Soil Excavation Volume = (24,147 cy) x (1/2) = 12,074 cy <br />Soil Fill Volume = (24,147 cy) x (1/2) = 12,074 cy <br />Total Area Requiring Grading / Surveying: <br />= (11,939 sy + 60,500 sy) = 72,439 sy <br />= (2.5 acres + 12.5 acres) = 15 acres <br />Final Cover Assumptions: The Total Final Cover Area = 674 acres. Assumed 10% of Final Cover Area will <br />require repair to a depth of 1-foot, by excavating sediment fill down to original grades and / or filling in areas <br />where erosion occured. Assumed 1/2 of the repair area (1/2 x 10% = 5%) will require excavation, and 1/2 of <br />the repair area (1/2 x 10% = 5%) will require fill. <br />Repair Area Calculations (various units): <br />Total Final Cover Area = 674 acres <br />Total Area to Be Repaired = (674 acres) x (10%) = 67.4 acres <br /> = (67.4ac) x (43,560 sf / 1 acre) = 2,935,944 sf <br /> = (2,935,944 sf) x (1 sy / 9 sf) = 326,216 sy <br /> = (2,935,944 sf) / (1,000 sf / M.S.F.) = 2,936 MSF <br />Excavation Area = (1/2) x (67.4 acres) = 33.70 acres <br /> = (33.70 ac) x (43,560 sf / 1 acre) = 1,467,972 sf <br />Fill Area = (1/2) x (67.4 acres) = 33.70 acres <br /> = (33.70 ac) x (43,560 sf / 1 acre) = 1,467,972 sf <br />Soil Repair Volumes: <br />Soil Excavation Volume = (1,467,972 sf) x (1-ft) x (1 cy / 27 cf)] = 54,370 cy <br />Soil Fill Volume = (1,467,972 sf) x (1-ft) x (1 cy / 27 cf)] = 54,370 cy <br />ITEM 3 - Total: <br />ITEMS 1 through 3 SUBTOTAL: