My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 11:00:21 AM
Creation date
2/25/2026 10:55:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0518458
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
DR
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1442 Colony DR RIPON 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology <br />Emergency Stop (E -Stop / ESO) Periodic Inspection <br />Facility Information <br />Technician Information <br />Site #: CHEVRON 210997 (N-4693) 210997 <br />Date: 1/7/2026 <br />Address: 1442A W COLONY DR. <br />Name: Jesus Saldivar <br />City / State: RIPON CA <br />Technician Signature: � jw- <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in accordance <br />with the E -Stop Testing Process. <br />SITE DATA <br />1 <br />Number of E -Stop switches INSIDE of the building: <br />1 <br />2 <br />Number of E -Stop switches OUTSIDE of the building: <br />3 <br />PERFORMANCE DATA <br />Yes <br />No <br />NA <br />3 <br />You have added or confirmed that all E -Stop locations are on the Site Diagram <br />4 <br />Do all E -Stops shutdown power to ALL DISPENSERS <br />5 <br />Do all E -Stops shutdown power to ALL STP's <br />f <br />C <br />6 <br />Are ALL E -Stops clearly Labeled <br />t <br />f <br />7 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />(+ <br />t <br />POST TEST <br />8 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />f <br />C <br />9 <br />All safety barricades and test equipment has been properly removed <br />( <br />f <br />10 <br />E -Stop was reset and all dispensing functions are normal <br />r <br />E -Stop Inspection Results <br />11 <br />PASS I FAIL I INCONCLUSIVE <br />Comments (Clearly describe any deficiencies found) <br />WO: 2387492 <br />
The URL can be used to link to this page
Your browser does not support the video tag.