Laserfiche WebLink
WOW Plan kr the Decommissioning M LWL Site 3n Welk page2 <br /> d. Muslim wells er fiuoresent that were installed originlly fur a specific prjet that <br /> has been cumpletd or terminated, no longer serve a practical punisme, and are <br /> restaurant with other nearby wells; <br /> .5. Vadwer came wells or de wagged wume investigation piczometers that arcmvaned <br /> above the anatomical zoo and gave not contained perchd groundwater for a <br /> significant peril of time cThe wells in this categury are not and will Milan used in <br /> dormouse for either soil vapor extraction or.wil vapor m rni wing hared on the very- <br /> low-twahentsdl vapm VOCnnsnmatiom prreentand tbeirdisWmefmmexisting <br /> buildings; <br /> 6. Wells shouted in crors-gradient W down-gradient locations past do nand omid <br /> have no realistic prospect of eve coming i vith <br /> groundwater containing L NL rwd contaminants' and have been dewardsed to <br /> be redundant with other wells heated closer m I l M derived groundwater <br /> conventional plumes; <br /> 7. Wells requiring decommissioning due to being within the footprint of new buildings <br /> heing constructed at Site 3M; and <br /> 8. Wells located in Operable Units (OUs) or su[ereas for which all remedial actions <br /> have been implemented and all of the following criteria have been met: the ground <br /> of Decision (ROD) has been completed, the cleanup gals specified in the ROD have <br /> been met, institutional controls are in place,and the site is protective ndhumsn health <br /> and the a t. In add r <br /> addition to these camera, Five years of continued <br /> groundwater and sell vapor monitoring have shown contaminant commutations in <br /> these Welk to have remaind stable and below cleanup standards, and comurreme <br /> nee diation completion has been provided for the OU car subarea by the regulatory <br /> Project managers (regulatory concurrence was received for the F rn General <br /> Services Area (EGSA) in 2012, and decommissioning of the MSA wellfeld <br /> f(Alowing mgulatary concunenee is specified in the GSA Remedial Design). <br /> All filuM cn ofthe obsolete wells selected for decommissioning fit one car more ofluee <br /> criteria. Ile criteria pertinent to each well is presented in ]able I as well as the condition <br /> of the well completion and the proposed unethical for decommissioning. <br />