Laserfiche WebLink
Work Plan ka he Decommissioning of LWL Site San Wall Pamir <br /> 4. Rey Personnel and Responsibilities <br /> Key personnel during well drilling and installation are as follows. <br /> Oemomsent HeW(Dll) <br /> The DH's responsibility is to ensure that all activities Performed by RRD at the Livermore <br /> Site and Site 300 are performed safely end comply with all pertinent regulations and <br /> Procedures including the institutional work planning and control process, and provide the <br /> necessary equipment and resources to accomplish the tasks described in this procedure. <br /> Pragnmr Lessul (PL) and/or Amlwrisingbrdivin ml (Al) <br /> The PI's responsibility is to ensure that all activities are performed sally and comply with <br /> all pertinent regulations and procedures including the institutional wash planning and <br /> son hot Process. 'I he AT palliatives and approves an Inessalion Work Sheet (IWS) in <br /> concurrence with the Responsible Individual (RD, ES&H Team Leaders) and the Facility <br /> Point of Contact (FVOC), haled on the determination that the work activity is adequately <br /> described, hwands and hazard controls are identified; institution requirements of the <br /> Findings and Demodulation are followed, and them is sufficient funding m initiate the <br /> work. <br /> Fwllily Point fConlacl (fiPm <br /> The FPO(: is responsible for releasing the work as described in an IWS alter ensuring all <br /> hazards have been identified and ad yuate controls are in place. Additionally, the ERD <br /> FPi is responsible for ensuring that ERD work is scheduled with the appropriate Work <br /> Corral Center (WCC) as necessuy. <br /> Rerprmsihle Aufn idual (W)i1nm Sefey OQcar MOM <br /> The RI or alternate III is directly responsible fix carrying out an operation, activity, or <br /> group of activities consistent with I WSs and other applicable E.q&H and Work COnnol <br /> Pmcessrequiremmts.activity the Rl directs the work ofothers to rnsurc the operation car work <br /> is perfomued safly and proceeds within the bounds ofthe institutional work <br /> planning and cannot pr0aas. In mesa case., this Rl and SSO are interchange lejob titles <br /> and responsibilifies within the ERD, bill when this is not the cam; the two wash closely In <br /> drre the work is car out in a safe manner. Mull it becomes necessary m raccom a <br /> ried ill site, the SSO has the authority to make the final decision regarding the new location <br /> bal on safety considerations. <br /> Whoustolov Team LeaAr (H L) <br /> 1 he HTI. is responsible for ensuring that the Drilling Work Plan and Sampling Plan arc <br /> Properly implemented by coordinating the work with the PL, RI, and Drilling Coordinator. <br /> The I ITL is also responsible for coordinating with the IT, to ensure that The drilling is <br /> consistewith Program Site Execution Plans and objectives, The work is authorized, and <br /> funding ris available tosm <br /> complete the work prior to rfing work The HTI. is responsible <br /> for notifying the PL if the work surge changes significantly such that cosh, schedules, or <br /> the achievement of its oblectives are impacted. 'rite HTI, has the authority to make <br />