Laserfiche WebLink
LM, 1?407015 Crue0 par Nrre .,aw„ 71" 541 an, aar,a„ <br /> 2. Solvents 'nay have been used by the CoM Shops to remove machining or cutting oils and <br /> tatting oils historically contained PCBs. <br /> The RWQCB expressed concern that, although SVOCs and PCBs have never been delocted in <br /> Easman GSA ground water, if Mess mnstimene were associated with Me craft shop thimis buried <br /> n the trenches, they might impact ground water in Me future. The Its. EPA and the RWQCB <br /> indicated that May would not considerclosum of the Eastern GSA site until these data gala were <br /> closed. Therefore, DOFJNNSA agreed to collect additional subsurface and samples fmm the <br /> Eastern GSA debris burial trenches for SVOCJPAH and PCB analysis to determine if these <br /> Ceftsfintrents are present, and if present, m determine wlmMer or not the concentrations of them <br /> constituents could impact ground Waterhouse Maximum Contaminant Leveis (MCLm, <br /> IIn12014, DOEJLI.NL submitted a Work Plan for these charumrimtion activities that was <br /> approved by EPA, DISC, and Me RWQCB (Ferry m al., N14). In September 2014, the I .LNL <br /> Environmental Instamdon Department (ERD) conducted this work for the DOWNNSA in <br /> onmntu to with the approved Woh Plan and other existing procedures developed for LLNI;s <br /> going Site 300 assessment and aim cleanup under CERCLA. In Woman m the subsudace .mil <br /> sampling refused by EPA not the RWQCB, DGE/LI NL aim collected gushed water samples <br /> from wells in the Eastern GSA debris burial (tench area and atelyeed Mem for SVOfS. Following <br /> Completion of tht additional characmriaation activities, DOEJLLNL submitted a 3'echniral <br /> Memommluan Men described the activities and results of the chamcmrimtion of SVOC/FAG, amd <br /> PCBs in subsurface soil in the Eastman GSA debris burial trenches area on January 15, 2016. On <br /> March 3,2016(RWQCB),April 5,2016 (DTSQad July 26,W16(EPA), Me regulatory agencies <br /> approved the 'I'malical Memorandum, and concuned that investigation of SVOCwTAHs and <br /> N'th in subokabov soil in the Easmrn GSA debris burial acrobat met was complete, and no <br /> further action for these constituents was needed. The Technical Memorandum is included in this <br /> 'upon as Appendix A. <br /> This Close O o Report cnnstitmes the documentation that conciliation of the Eastern GSA <br /> Subarea of the GSA OU has been completed. <br /> 2.2. Removal Actions <br /> Prior to the signing of Me GSA ROD in 1992, removal actions and related activities in the <br /> hasten GSA included: <br /> Ground water extraction and treatment which was initialed in the Eastern GSA in 1991 an <br /> begin rcmediation VOCs served Rome Me debris burial trenches to ground water. <br /> • Moaned no Ofonsite and oRsk ground water to evaluate the effectiveness of Me removal <br /> action in reducing VOC concentration; in Eastern GSA ground aster, and to track Va: <br /> Plume migration that could potentially impel offsite water-supply wells. <br /> • The non-time critical ground water extraction and treatment and monitoring removal action <br /> to remove TCE and Other VOCs in the Eamem GSA continued as a remedial action after <br /> the GSA ROD was signed in 1997, as discussed in Section 2.4. <br /> 2.3. Remedial Invesflgation/Feasibflity Study <br /> DOE began environmental investigations in the GSA in 19112. Review of historical records <br /> and photographs and inhrv'ews with present, former, and refired LLNI. employees wee <br />