Laserfiche WebLink
y <br /> RDM ENVIRONMENTAL <br /> Silellealth and Safety Plan <br /> Actinium Planned (Check than that are applicable) <br /> 1. GENERAL INFORMATION <br /> uudtrgmuM storage tank removal <br /> Dale: October 14, 2019 oversight of wit escalation w'ido barkh« or other equipment <br /> irrationalism soil sampling during nil esavatiom and removal <br /> Project Name: HUNTBROOX HOLDINGS LLC soil gas survey <br /> Project Site Location: 3138 E Mon SL, Stockton, CA X nil Wring mid and midgronndssater gab sampling <br /> Client Contact/ hlrs Angela Let: Phone: (916) 2214402 X drilling of%ells, including humiliation,development and sampling of groundwater <br /> and nil <br /> HunRrwk Holdings LLC <br /> 2331 Sumet Blvd, 4179-717 gonal mer sampling of main wells <br /> Rockli % CA95365 other <br /> Project Manager: Mike Berringmn Dale <br /> Thz Project hlwapris rczbeplan a fw ill wawarml ands incuiinghavin% ill eppropofeachans <br /> pcpar<d anddisWWang theplens to field pilt The <br /> and to auDrorizd of each <br /> subonvacmrcmploy<drop<rfam walth ensile. Theolan(H Iq are aisdo t Thisincludefor 11. SITE INF'OIl\IAilO\ <br /> tiring that the povisiwzo(Ihz Health and Safe? Plan (HSP) a< cemW out This includes <br /> clearing <br /> m that all Etldprro,mxl M1av<rmis'W edequale valuing, lM1at an adequat< suppl5•ar Site Description: The site is Would at 3138 E Main St in the abr orStacMon, Connor of <br /> safety and emergency equipment is available San Jaggms Calif is, The site isw'asf cdya fuel service station. Site impovemenm <br /> Designated Site Safes Officers: Ma;e Beni carbide av2ewtf her 19{0'z<rastatiw building at front ofpopdy and a largzrvacwt <br /> gne y ngnn Dale build'ungmr<arcXproPerty. <br /> Th< Site Seely Officer (SSO) is responsible for impkmenting the site health and immy pia, Unusual Features: Transients frcquwt the area and have been known touw N< pmpdies <br /> This includes zmuring chat field prwmel have read and signed the LISP, and Bra a Tailgate H)T<rdermic medles, human wilew and other lransienFrelateddxbris have been obscnxd on the <br /> Safety Mxling iswnd«tsd on site each day prim W initiating field ativilia. inadditio,the popn)•. Ast<mip (encewmrcun0y imtallM ant appmsmhlimilln% varzicntimpxvm <br /> SSO will be respell for auditing dw sil"Nodio s for compliance with We haldm and safety be <br /> plan and my applicable federal, state«local rsquktmcnts The SSO is required to be of site at Pmpem. <br /> alltimes In the SSO's absem<, a designated ilvmale will assume the duties ad Site nackgrounbtfistory: iklirlo RDnf's WoAPlmforPmpmedAddidonnlOJ[ile <br /> rtspomibilities. GmlmdrnterAfmlfortng Melts, dated January 2, 2019. <br /> Work Objectives cope: Drill and install two, off-site, Lmrh dig. groundwater monitoring <br /> wells in the City of Stockton public right-of-way (South Windsor Ave. pared shoulder) <br /> sing a bellow stem auger drill rig. <br /> 2 <br /> Overall Huard Level: ❑ Serious My Moderate ❑ Low ❑ Unkmmo genuil naturzof<anmmctiw vz«L:. Pleasercfu ash alsachzd Ph>'siW Hmard Analysis <br /> Shots f«wnvols <br /> Commands: Now <br /> Heal X SIiP.Tri0. Fall Ewratiow/lrsmM1es <br /> X Cold X Non X Moving Equipm<m <br /> W'mm TSpe(s) (Mark slime Nat arc applicable): X literm X Underground Harads X Traffic <br /> X Fog Overhead Harerds Other. <br /> Pewkum liquids Other(pleau zperify): <br /> Pelrokumsludgts Human waste mud h3padermic melft LeniofProt«lion: ❑ A ❑ B a • D <br /> X Caulmniwkd wilAvakr <br /> Modifications: Mmdibwtionewkv<Horpate<kw anallmmxe yBa sso beta on <br /> \1'aale Chanct<riati«: kthosethat area liable : a Enil«ioggredur. <br /> 'Mar applicable): Site Entry Pr«edures: The site will his entered from the from driveway. <br /> X Igdvble X Volatile Silt Control Measures: Unaudmrized prsom,cl will not be allowed in Be walk anal No <br /> alive& driddng«smokinginlh< w«k area The Field Supenisorshall enf edrece measures <br /> Corrosive Radiative Spillszrcmt <br /> Toxic Unknown ap<tcd leha<wumwdueprojut <br /> Reactive X Other(pleam specify): biolegialAloodbome , A lailgate ssfcgy meeting will the held by she SSO for of site personnel. The safety diouamem <br /> vehicular As Pedestrian traffic, and ezpiwiva will include, in addition to ether itenrs in this Health and Safety Plan, Ue follmving heal <br /> Sik prsomel xillwttute pmpzrliging lcxhnigmzfor M1eavy items The <br /> RnownMuspectm Chemical Hazards: 'lhepimaD'wmtiments ofniosm ae gasoline maximum weight to be lined by any she personnel should not cvcced LO lbs. <br /> hydrwmbom including volatile organic compounds- . Mucimkn sax shall h secured arwrd the saarL arcs, <br /> FIRSTAID: . Hospital ran It map aM1ill h staged (em5' x«at during drilling orivida. <br /> Inhalation - At first signs a(M1endmh<wdi'airwszrcmav< victim Bon wok area and give a Cache Personnel shall moves the SSOwidu any Hearth and Safety lines. <br /> Edon air. Ifhwddnghu moped, admidmer aAficiilrespimtioa Get m<aival atkntim <br /> immediately. Personal Decontamination Pronclurm: lVmh andsand fx< piwawting,drid:inga <br /> Skin and Eve Contact - Flush eyes immediately vvith water fast least 15 minutes, winking and lxf Iwvmgthesite. Remora contaminated ebthin% mwammpossiblz. <br /> occeasionallytiffingulnevelids. Reran contw,inated cl«Mng. WazM1aft Wbodymennith Equipment Decontamination Procedures: Ummmination by washing during swell sampling <br /> Iar&< anumnts ofswpand veavr. Get medical alkmiw ifimta0on Persizv alizrwasM1ing. mcan ez <br /> Ingestion - Dona indu« vnmiting XuPvictimwamnndairml. Gct medical olkntie, Saniatiw Facilities: Rezvmnf«kN men and vramcn tee aralHbls mina. <br /> Physital Hazards: Thmehzards are primarih associated vviU«vit<tquign<nt and Nx Personal Protective Equipment: <br /> 3 4 <br />