Laserfiche WebLink
7. Update the current Parmar Texaco Problem Assessment Report along with the existing <br /> Site Conceptual Model using information developed in items 1 to 4 above. The site <br /> conceptual model will also be updated to include the new information collected and <br /> analyzed. <br /> The scope of work proposed in this work plan is designed and anticipated to adequately <br /> address the remaining steps to closure,with exception of Soil Vapor Extraction(SVE) <br /> rebound testing, as outlined in the Muir letter recently submitted regarding Pathway To <br /> Closure. <br /> i <br /> Parmar\Site Assessment Workplan\02152018.wpd 10 <br />