SCHEDULE <br /> FREY will commence pre-field activities following approval of this workplan by the RWQCB. It <br /> is estimated that 2 weeks will be required to obtain a well installation permit from the SJCDEH. <br /> Drilling and well installation activities will require two days. Well development (no sooner than 2 <br /> days after well installation activities) and well survey activities will each require one day. A <br /> laboratory report with results of soil sample analyses will require 10 days to receive. A report <br /> documenting well installation activities will be submitted to the RWQCB approximately 3 to 4 <br /> weeks following the receipt of the laboratory data. It is estimated that between 6-8 weeks will be <br /> required to conduct the activities discussed in this workplan following workplan approval. <br /> If there are any comments or questions regarding this workplan, please contact us at your earliest <br /> convenience. <br /> Si rely, <br /> F EYEnvi <br /> iron z <br /> .q Not. v h, . <br /> LU 4i <br /> J e Fr # Y Eli Appelgate <br /> rincipa CeTn c � Staff Geologist <br /> gine mg Geo C GIT#1549 <br /> C 1500 <br /> c <br /> ent cker a n+ N <br /> NO. 7584 M "4 <br /> Senio Project Geolo 'ttt Exa <br /> PG# 7584 NT <br /> OF OP`P <br /> cc: Roger Hartley, iF Club LLC <br /> Scott Lookingbill (SWRCB) <br /> Adrian Perez (SWRCB) <br /> State Water Resources Control Board, UST Cleanup Fund (Geotracker) <br /> FREYEnwronmental Inc. 6 Project No. 1175-01 <br />