Laserfiche WebLink
Groundwater Monitoring Well Construction Workplan <br /> February 2024 <br /> groundwaters could affect agricultural well owners whose wells minimum depths are about <br /> 600 feet bgs. <br /> The screens of the D level screens, the deepest monitoring well, will be positioned in the first <br /> aquifer above the base of fresh water to detect changes in groundwater levels and salinity and to <br /> evaluate whether pumping may be causing upwelling of saline water from the underlying marine <br /> sediments. <br /> All monitoring wells will be outfitted with transducers and telemetry to measure groundwater <br /> levels. The measurements will be reported to DWR's Monitoring Network Module. Water <br /> quality samples may be collected from the monitoring wells, but a schedule has yet to be <br /> established. <br /> GEI Consultants, Inc. 18 <br />