Laserfiche WebLink
Groundwater Monitoring Well Construction Workplan <br /> February 2024 <br /> Monitoring Well Completion Report <br /> Upon completion of the work, a Monitoring Well Completion Report will be prepared to for each <br /> monitoring well to document activities completed for the project including methods and results. <br /> The report will contain the following information: <br /> • Applicable permits <br /> • Lithologic logs of the pilot holes <br /> • As-built well construction details <br /> • Development records <br /> • Survey coordinates <br /> • Water Well Completion Reports filed by the driller with DWR and SJCEHD <br /> • Groundwater level measurements <br /> • Groundwater quality analyses <br /> GEI Consultants, Inc. 24 <br />