My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 12:08:47 PM
Creation date
3/5/2026 3:50:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231074
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4627 DA VINCI DR STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of CP22 - UST FULL violations that have not been <br /> addressed for 7-ELEVEN INC #20632 as of February 27, 2026. <br /> Open violations from December 16, 2025 inspection <br /> OBSERVATION:An inspection was last done on 12/4/2024 and an inspection report was issued identifying information <br /> to be submitted to bring this site into compliance. This information was required to be submitted by 1/10/2025. This <br /> information has not been fully received resulting in a non-compliant status for this facility. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include all <br /> of the recommendations made in the report.The operator shall submit a written response that includes a statement <br /> documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> OBSERVATION: Rubber seals were found to be torn, cracked, and sections were missing from the lids of the 91 and <br /> diesel STP sumps. <br /> REGULATION GUIDANCE: Secondary containment shall be impervious to the liquid and vapor of the substance <br /> contained and constructed to prevent structural weakening as a result of contact with any hazardous substances <br /> released from the primary containment. <br /> CORRECTIVE ACTION: Immediately contact a properly licensed,trained, and certified contractor to make repairs to <br /> the UST system under permit and inspection of the EHD. <br /> OBSERVATION: liquid was found in the Regular and Premium fill sump indicating a leak in the secondary <br /> containment. <br /> REGULATION GUIDANCE: Secondary containment shall be impervious to the liquid and vapor of the substance <br /> contained and constructed to prevent structural weakening as a result of contact with any hazardous substances <br /> released from the primary containment. <br /> CORRECTIVE ACTION: Immediately contact a properly licensed,trained, and certified contractor to make repairs to <br /> the UST system under permit and inspection of the EHD. <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.