My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2026 4:34:46 PM
Creation date
3/5/2026 4:29:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0529124
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO AM/PM #83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26159011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
1340 W Colony RD Ripon 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N-10 A Q U I N Environmental Health Department <br /> —COUNTY— <br /> UST SYSTEM RETROFIT OR REPAIR <br /> 1. Site map enclosed? YES ' NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan"is available on the jobslte as required by Title B. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. if repairing a component, describe <br /> how this will be done. (if adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br /> SCC _SCvx'�► a� cVo!"� Q�aG'�Gel ShCC--'�' <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> tkhm ne- Ova_-6+ , -3 <br /> ylecc) 63'" O j�i,o 1rza�, Cn ver-s <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[j NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone (__) <br /> Address City Zip <br /> 4of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.