My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 4:30:44 PM
Creation date
3/5/2026 4:29:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0529124
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO AM/PM #83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26159011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1340 W Colony RD Ripon 95366
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A N S 10 A Q U I N Environmental Health Department <br />—COUNTY— <br />S I <br />COUNTY— <br />ST SYSTEM RETROFIT OR REPAIR <br />1. Site map enclosed? YES' NO[] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br />the "Site Health and Safety Plan" is available on the jobslte as required by Title B. <br />3. Detailed description of work to be completed, t.ist components to be repaired or replaced and attach a <br />diagram drawn to scale showing location of repairs and/or replacements, if repairing a component, describe <br />how this will be done. (if adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br />SCC oyo!"� Q GtG'liGt� shCC. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval}: <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. identify contractor performing decontamination: <br />Name <br />Address <br />Phone (__) <br />_City Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.