Laserfiche WebLink
• . Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address: : GdSla7906 N El Dorado Stockton 95210 <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . ea T L F V <br /> . . . . . . . . . . . . . . . <br /> TLS 350R---E x x H <br /> p �9. <br /> M <br /> . . . . . . . . . . . . M <br /> E. <br /> 87 Slave T F V R <br /> . . . . . . . . . . . . A <br /> x <br /> . . . . . . . . . . . . . I . . I . . . . . . . . . . .( <br /> 3 . . . . . . .1 . . . . . . . . N. <br /> . . . . . . . . . . . . . . . E- <br /> nap Taps. <br /> ^ 4 . . . . . . . . . . . . . . . . . 87.AIM= .tPipe F V x <br /> P <br /> - . i <br /> z a . . . . <br /> 8 8 . . <br /> TL F V <br /> x xo <br /> KEY <br /> A=.AXNULAR <br /> F=FILLS *PIPLNG+ <br /> T=TC-RBLYE (.ARROWS) <br /> P=PROBE . . . . . . . . . . . . . . . . . . . Drawing of <br /> V_VAPOR . . . . . . . . . . . . - pq=g exit of <br /> %=SLTSIP SENSOR . . sump and L'DC's. <br /> L=Leak Detector No underground <br /> 3,1=ki"WZY Lip hear urrirgr"d that are rta risible to thr ceHi6ing terinician o'e a drawing is <br /> B I=Smart Sensor p c�essiartzl o7rruian omit and are sde{u far ir/ornrrti�rol pagxa DraH trig agoaft we <br /> cannot speculate <br /> late <br /> to seals sp <br /> S=STP bhte priat- <br /> c=Floats&chaists _ <br /> E=E SroP <br /> EL DORADO <br /> Date map was drawn03+27l19 <br /> Instruiebons <br /> r� If you already have a diagram that shows al required information,you may include it rather than this page,with your Monitoring System Certification. On your site plan. <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,d installed:monitoring system control panels:sensors monitoring tank <br /> annular spaces.sumps.dispenser pans.spill containers,or other secondary containment areas.mechanical or electronic line leak detectors:and in-tank liquid level <br /> probes(if used for Leak detection). In the space provided.note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />