My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAZELTON
>
1810
>
2300 - Underground Storage Tank Program
>
PR0231141
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 2:02:15 PM
Creation date
3/9/2026 9:46:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231141
PE
2361 - UST FACILITY
FACILITY_ID
FA0003954
FACILITY_NAME
SJ CO PUBLIC WORKS CORP YARD*
STREET_NUMBER
1810
Direction
E
STREET_NAME
HAZELTON
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
15518002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1810 E HAZELTON AVE STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRr1'1 N MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit. The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-34:20 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2fi41(h) CCR, <br /> Facility Name, SAN JOAQUIN COUNTY PUBLIC WORKS YARD <br /> Facility Address 1810 E. HA2ELTON AVE. , STOCKTON CA 95205 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank ANNUAL ANNULAR HYDROSTATIC TEST FOR GASOLINE AND DIESEL <br /> P ip in it, C- e <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank VEEDER ROOT - TLS-350 <br /> Piping VEEDER ROOT - TLS-350 <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> BUILDING NORTH OF FUELING ISLAN - THRU FIRE DOOR ENTE.AUQE <br /> INTO OFFICE <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> MONITORING - JUNE OKUBO/NIGHT WATCHMAN (468-3077) <br /> MAINTENANCE - EARL GILFORB ADMINISTRATIVE ASSISTANT IX 468-310 <br /> E. Reporting format for monitoring: <br /> Tank VEEDER ROOT TAPES PRINTED DAILY/SAVED AND <br /> Piping FORWARDED TO EARL GILFORD MONTHLY <br /> F. Desenbe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every L months: STOCKTON SERVICE STATION TO CHECK <br /> VEEDER ROOT EVERY 12 MONTHS <br /> G. Describe the training necessary for the operation of UST system. including piping;, <br /> and the monitoring equipment: STOCKTON SERVICE STATION PROVIDED VERBAL <br /> INSTRUCTIONS ON VEEDER ROOT. A USER MANUAL ALSO PROVIDED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.