Laserfiche WebLink
Remeldial Action Plan June 14, 2017 <br /> Project#Z054000052 Page 5 <br /> extraction test, groundwater pump and treat and SVE technologies were capable of removing high <br /> concentrations of hydrocarbons from soil and groundwater beneath the site (Park, 1999). <br /> A soil vapor and groundwater extraction and treatment system was started on April 26, 2001. The remediation <br /> system was connected to soil vapor extraction (SVE) wells VW-1, VW-2 (A, B), VW-3, VW-4 (A, B, C), VW-5 <br /> (A, B, C), and VW-6 (A, B, C). The system operated until November 2007, when it was shut down for the <br /> fourth quarter 2007 sampling, UST removal, and well destruction activities. The system conveyance lines were <br /> reconnected and the system was restarted in April 2008. GHC upgraded the soil vapor and groundwater <br /> treatment system in September 2008. The system pad was expanded to include a 350-gallon batch tank, a <br /> bag filter, a 1 HP transfer pump, four 1,000 pound granular activated carbon liquid-phase vessels, and a <br /> groundwater extraction system control panel. The upgraded system was designed to extract vapor from wells <br /> VW-1, VW-3, VW-4, VW-5, and VW-6, and extract groundwater from wells MW-11R and MW-12R. The <br /> system was restarted in December 2008. The groundwater extraction (GWE) system was never re-started <br /> following completion of the system upgrade activities. The GWE system extracted and treated 582,804 gallons <br /> of groundwater from the subsurface. The SVE system was subsequently shut down on March 19, 2009 for <br /> repairs and remained off-line as negotiations between Thrifty and ConocoPhillips regarding the transfer of site <br /> responsibility were conducted. As of March 19, 2009, 210,156 pounds of hydrocarbons had been removed by <br /> the SVE system (GHC, 2009). <br /> In July 2007, GHC performed an ozone sparging bench scale test. Results indicated that the site petroleum <br /> hydrocarbons in soil and groundwater were successfully destroyed with ozone treatment. Ozone sparging, <br /> however, generated concentrations of chromium VI and bromate that exceeded the California maximum <br /> contaminant levels (MCLs) for these compounds. Based on the results, ozone sparging was determined to not <br /> be a feasible method of groundwater treatment (GHC, 2008b). <br /> In July 2010, Stantec performed a 5-day SVE system shake down and ROI test. Results indicated that there <br /> was no longer a need for vapor extraction at the site related to vadose zone treatment. Stantec subsequently <br /> submitted an Interim Remediation Action Plan, dated August 27 2010, that was approved by the SJCEHD on <br /> September 2, 2010. The IRAP proposed to run the groundwater extraction system on MW-11 R until site <br /> demolition activities began at the site. However, due to an accelerated redevelopment schedule, interim <br /> remediation was postponed in preparation for the site demolition. The remediation system has been removed <br /> and the conveyance piping has been cut at the well boxes in preparation for the recently-completed <br /> redevelopment activities. No remedial equipment is currently present at the site. <br /> In ATC's Site Conceptual Model and Human Health Risk Assessment, dated September 30, 2011, ATC <br /> recommended the completion of additional soil and groundwater delineation and soil vapor sampling activities <br /> be performed at the site prior to proposing any additional remedial activities. The additional site assessment <br /> activities were performed during first quarter 2012; and a report documenting the findings was submitted in <br /> July 2013. On January 14, 2014, Cardno ATC submitted a Corrective Action Plan and recommended a <br /> remediation strategy consisting of a combination of air sparging and soil vapor extraction. <br /> Cardno ATC submitted Air Sparge/Soil Vapor Extraction Pilot Test Work Plan dated July 7, 2014, and <br /> implemented the work in the first quarter 2015. The pilot testing indicated that vapor extraction and air <br /> sparging were viable methods for remediating impacted soil and groundwater at the site. Results were <br /> summarized in Cardno ATC's Pilot Test Summary Report dated August 4, 2015. <br /> 2.4 SENSITIVE RECEPTORS <br /> In November 1992, SSB Environmental Consultants, Inc. (SSB) performed a well survey within a '/z-mile radius <br /> of the site. Results indicated that the City of Stockton well No. 11 was located at the corner of Inglewood and <br /> Leslie Avenues approximately 2,100 ft southeast of the site. In addition, a number of private wells were <br />