My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0542109
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2026 1:33:33 PM
Creation date
3/11/2026 11:28:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542109
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024185
FACILITY_NAME
FORMER THRIFTY OIL CO STATION NO 172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
7647 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Thrifty Co.Station No. 172 <br /> Workplan for Additional Soil and Groundwater Assessment <br /> May 8,2017 <br /> TABLE OF CONTENTS <br /> 1.0 SITE BACKGROUND............................................................................................................1 <br /> 2.0 SITE LOCATION ...................................................................................................................1 <br /> 2.1 Previous Investigations.......................................................................................................1 <br /> 2.2 Site Remediation..................................................................................................................4 <br /> 2.3 Sensitive Receptors.............................................................................................................5 <br /> 2.4 Characterization Status.......................................................................................................6 <br /> 3.0 SCOPE OF WORK................................................................................................................7 <br /> 3.1 Monitoring Well Installation................................................................................................7 <br /> 3.2 Reporting..............................................................................................................................9 <br /> 3.3 Scheduling............................................................................................................................9 <br /> LIST OF TABLES <br /> Table 1 Well Construction Details <br /> LIST OF FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan with Proposed Well Locations <br /> LIST OF APPENDICES <br /> Appendix A Regulatory Correspondence <br /> Appendix B General Field Procedures <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.