My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601159
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CESAR CHAVEZ
>
7329
>
2600 - Land Use Program
>
SU-2601159
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2026 9:20:22 AM
Creation date
3/18/2026 4:19:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2601159
PE
2634 -ZONING COMPLIANCE REVIEW - MINOR (Z)
STREET_NUMBER
7329
Direction
S
STREET_NAME
CESAR CHAVEZ
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19305011
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
7329 S CESAR CHAVEZ RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. Standpipe valves shall be non-pressure reducing valves, non-pressure restricting valves, <br /> standpipe valves shall be U-Angle Hose Valves consisting of a 2.5" inlet and 2.5"outlet. <br /> Preferred brand Elkhart Brass. <br /> s. Valve outlet shall point at a 90-degree angle outward toward landing <br /> 4. Underground Piping for Fire Sprinkler Systems: <br /> a. All underground piping for fire sprinkler systems must be approved by the Fire <br /> Department before permit issuance. <br /> 5. Protection of Gas Meters and.Piping: <br /> a. Above-ground gas meters,regulators,and exposed piping shall be protected from <br /> vehicular damage in an approved manner. <br /> 6. Fire Suppression Systems: <br /> a. All buildings must have an approved monitored automatic sprinkler system in <br /> compliance with NFPA 13, CFC, and CBC. <br /> b. Fire alarm/sprinkler monitoring shall be Point ID. <br /> 7. Fire Suppression Approval: <br /> a. Plans and specifications for fire suppression systems must be submitted for review and <br /> approval before construction, <br /> b. Any deviations from approved plans require submission of"As-Built"plans before final <br /> inspection. <br /> 8. Deferred Submittals: <br /> a. Plans listed as deferred submittals must be clearly labeled on the building permit <br /> submittal cover.sheet. <br /> 9. Fire Protection Inspections: <br /> a. Fire protection systems(hydrants,water mains, etc.)must be installed,tested, and <br /> approved by the AH7 before any building permits are issued. <br /> b. The Fire Department must witness all system:and acceptance tests. <br /> c. A minimum of 24-hour notice is required before any system or acceptance tests. (Submit <br /> requests at www.frenchcampfire.com) <br />
The URL can be used to link to this page
Your browser does not support the video tag.