My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 1:33:43 PM
Creation date
3/26/2026 9:48:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231130
PE
2361 - UST FACILITY
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #132
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07118020
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3555 W HAMMER LN STOCKTON 95219
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Environmental Reporting System (CERS) Underground Storage Tank- Monitoring Plan <br /> Facility/Site <br /> UIK STOP MARKET#132 UST Tank#/CERS Tank CERSID <br /> ID# 10180893 <br /> 555 W Hammer Ln TA0113005/ <br /> 10180893-002 <br /> Stockton,CA 95219 Tank Info:Installed Date:1/1/1991 12:00:00 AM-Tank Use:Motor Vehicle Fueling-Tank <br /> Contents:Regular Unleaded-Type Of Tank:Double Wall-Piping Construction:Double- <br /> walled <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER-ROOT VEEDER-ROOT <br /> Panel Model# Leak Sensor Model# <br /> TLS-350 0794380-208 <br /> es Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes Failure/Disconnect Triggers Pump Shutdown <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> VMI LD-2000 <br /> Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> ELLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> DC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> ontinuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer Yes <br /> SEDER-ROOT Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> DC Panel Model# Yes <br /> LS-350 UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer <br /> SEDER-ROOT UDC Construction <br /> DC Leak Sensor Model Single-walled <br /> 794380-208 UDC Secondary Containment Monitoring <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Periodic System Testing <br /> ELD Testing <br /> Yes Secondary Containment Testing <br /> Yes Spill Bucket Testing <br /> Printed on 4/2/2026 4:14 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.