Laserfiche WebLink
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) 87 OCTANE 91 OCTANE <br />Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br />secondarily contained? p No ❑ No p No ❑ No <br />OPE Model 61 SO 71 SO <br />What is the OPE response when activated? p Shut off ❑ Shut off 0 Shut off ❑ Shut off <br />(Check all that apply.) Flow Flow Flow Flow <br />El Restricts ❑Restricts ❑Restricts ❑Restricts <br />Flow Flow Flow Flow <br />❑ Audible ❑ Audible ❑ Audible ❑ Audible <br />Alarm Alarm Alarm Alarm <br />❑ Visual ❑ Visual ❑ Visual ❑ Visual <br />Alarm Alarm Alarm Alarm <br />Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br />that may interfere with the OPE operation? p No ❑ No 0 No ❑ No <br />At what level in the tank is the OPE set to 101 1 /2 97 <br />activate? Inches from bottom of tank <br />What is the percent capacity of the tank at <br />which the OPE activates? 94.0 % 90.6 <br />Is the OPE in proper operating condition to p Yes ❑ Yes p Yes ❑ Yes <br />respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br />reaches the designated regulatory level? <br />7. SUMMARY OF TESTING RESULTS <br />p Pass ❑Pass p Pass ❑Pass <br />OPE Inspection Results ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />* Mark here if: <br />❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page maybe attached. <br />Attach tank chart(s), measurements, calculations, and In -Tank Setup report(s) <br />Page 2 of 2 <br />