My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1856
>
2300 - Underground Storage Tank Program
>
PR0231069
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2026 11:30:38 AM
Creation date
4/3/2026 11:29:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231069
PE
2361 - UST FACILITY
FACILITY_ID
FA0001909
FACILITY_NAME
STOP N SHOP
STREET_NUMBER
1856
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12319102
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1856 W COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. CONTAINMENT SUMP AND UDC TEST <br />Test Method Developed by ❑ Manufacturer ❑ Industry Standard x Professional Engineer <br />Test Type ❑ Pressure ❑ Vacuum X Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />❑ Check this box if Appendix 8.3 continuation page is attached. <br />Sump/UDC ID <br />1 -Regular 87 -PS <br />2 -Super 91 -PS <br />Sump Manufacturer <br />XERXES <br />XERXES <br />Sump Depth (inches) <br />40" <br />35" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />14" <br />15" <br />Test Start Time <br />12:22 <br />12:27 <br />Initial Reading <br />.001 <br />.001 <br />Test End Time <br />12:52 <br />12:57 <br />Final Reading <br />.001 <br />.001 <br />Change in Reading <br />0 <br />0 <br />Pass/Fail Criteria <br />.002 <br />➢ .002 <br />Tightness Test Results <br />P a s s <br />P a s s <br />Continuity Test Results <br />NA <br />NA <br />Sump/UDC ID <br />UDC 1&2 <br />UDC 3&4 <br />Sump Manufacturer <br />Bravo <br />Bravo <br />Sump Depth (inches) <br />10" <br />10" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Bottom <br />Penetrations <br />Bottom <br />Penetrations <br />Test Start Time <br />12:32 <br />12:37 <br />Initial Reading <br />.001 <br />.001 <br />Test End Time <br />1:02 <br />1:07 <br />Final Reading <br />.001 <br />.001 <br />Change in Reading <br />0 <br />0 <br />Pass/Fail Criteria <br />➢ .002 <br />➢ .002 <br />Tightness Test Results <br />P a s s <br />P a s s <br />Continuity Test Results <br />N A <br />N A <br />Describe in Section 9 all tests marked "Fail" and any repairs made during the test. Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.