My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2057
>
2300 - Underground Storage Tank Program
>
PR0231083
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2026 9:35:42 PM
Creation date
4/3/2026 12:25:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231083
PE
2361 - UST FACILITY
FACILITY_ID
FA0003735
FACILITY_NAME
Top Gas Corporation
STREET_NUMBER
2057
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16515309
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2057 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Release Detection Equipment Testing Report Form <br /> 9. MONITORING SITE PLAN <br /> Attach a copy of the facility's UST Monitoring Site Plan that shows the general layout of tanks and <br /> dispensers, locations of the monitoring panel and all other release detection equipment, VPH monitoring <br /> zones (if applicable), and the date the site plan was prepared. Include a legend for all symbols depicted. <br /> Underground Storage Tank <br /> Monitoring System Certification Form <br /> MONITORING SITE PLAN Stockton Food And Gas,2057 S.El Dorado St.,Stockton,CA 95206 <br /> If a site plan has been prepared that shows all required information,you may include it, rather than this page <br /> with your monitoring system certification form.The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> DELHI AVE. <br /> F o <br /> T L <br /> si U) <br /> q 01 <br /> 87 <br /> U U 7 �I <br /> c <br /> II <br /> E>GSTORE <br /> • Uid <br /> LEGEND LINE LEAK <br /> • MONITORING PANEL VEEDER ROOT <br /> L DETECTOR VMI 99LD2000 <br /> TLS-350 <br /> A ANNULAR SENSOR VEEDER ROOT 794380-409 PRODUCT PIPING —•��•� <br /> F FILL AND VAPOR DIRECT BURY VAPOR RECOVERY —„ <br /> SPILL BUCKET PIPING <br /> T TURBINE SUMP VEEDER ROOT <br /> LIQUID SENSOR 794380-208 VENT RISER 000 <br /> U UDC'S LIQUID S. BRAVO <br /> SENSOR CHAINS&FLOATS <br /> CAS CLEAN AIR SEPARATOR <br /> 20 10 0 20 40 60 <br /> SCALE 1"=20' <br /> Page 6 of 6 <br /> Describe all answers marked "No"or"Fail'and the proposed remedy in Section 8. <br /> List all equipment either replaced or repaired (including cleaning or adjustment) in Section 8. <br /> Page 6of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.