Laserfiche WebLink
0.NaL 1N'•c SAN JOAQUIN COUNTY <br /> 2 ENVIRONMENTAL HEALTH DEPARTMENT <br /> N'• { 1868 East Hazelton Avenue, Stockton, CA 95205 <br /> cce Telephone:(209)468-3420 Fax:(209)468-3877 Web:www.sjgov.org/ehd <br /> ORS\ <br /> NITRATE LOADING STUDY REQUIREMENT CHECKLIST <br /> 22�ESITELOCATION: 20 �,• 0utlelo Whet UhdtV) q 29WIT, PA#: <br /> 7� <br /> SU�ZI��J�Z✓) I�pN CD�13-�3�"102 ZZ��.� REPORT DATE: garGh <br /> Z <br /> s = Sufficient I = Insufficient San Joaquin County Development Title Chapter 9-1105,Section 9-1105.2 <br /> S I 1.0 CHEMICAL AND PHYSICAL PROPERTIES OF SOIL <br /> ❑ 1.1 Description of the chemical and physical properties of the soils underlying the site. <br /> ❑ 1.2 Description of the mass transport properties of the soils underlying the site with respect to nitrate and/or any other <br /> constituent of concern identified for the project site. <br /> 2.0 GROUNDWATER ANALYSIS <br /> l9 ro u I <br /> ❑ 2.1 Description of: depth to groundwater, seasonal fluctuations of groundwater depth, directional flow and gradient. <br /> ❑ 2.2 Description/discussion of any existing or potential groundwater contamination issues in the general location of the <br /> site. <br /> .1] ❑ 2.3 Description of the current use of groundwater at the site and of the future expected use of groundwater as related <br /> to the proposed development project. `r x VMhA mmric VJ& <br /> 3.0 SOURCES AND CALCULATED IMPACT OF NITRATE TO GROUNDWATER <br /> ❑ 3.1 Description of all current off-site sources of nitrate to soil and groundwater in the general up gradient area and the <br /> contribution of nitrate load from these sources to the project site. <br /> [� ❑ 3.2 Description of impact of rainfall contribution of nitrate load to the project site. <br /> ❑ 3.3 Description of all current on-site sources of nitrate to soil and groundwater and the contribution of nitrate load from <br /> these sources to the project site. <br /> ❑ 3.4 Description of all proposed future on-site sources of nitrate to soil and groundwater and the contribution of nitrate <br /> load from these sources to the project site. <br /> ❑ 3.5 Calculated mass balance of nitrogen loading considering all potential sources identified. Use of <br /> Hanztch/Finnemore, or other appropriate formula/model, if applicable. <br /> ❑ 3.6 Calculated impact of nitrogen loading from site project to down gradient wells, rivers, lakes etc. <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS RELATIVE TO PROPOSED METHOD <br /> OF WASTEWATER DISPOSAL �\ <br /> ❑ 4.1 Discussion of total nitrate impact from proposed project. <br /> ❑ 4.2 Description of the methods proposed to mitigate any known or future impact to soil and groundwater from nitrate, <br /> and/or any other constituent of concern, at and/or around the project site. RkpUrt - h0 MTV Y)r),1 Ati M <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS SECTION recomy u r"( r0a <br /> ❑ 5.1 The report was signed, dated and stamped by a qualified environmental professional. <br /> P ❑ 5.2 The attachments/appendices contain sufficient documentation to support claims made in the report. <br /> Reviewed By: Reviewed Date: <br /> EHD 26-02 Pagel of 2 Nitrate Loading Study Checklist <br /> 7/14/2003 <br />