My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MATHEWS
>
36
>
1900 - Hazardous Materials Program
>
PR0519614
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2026 3:34:38 PM
Creation date
4/9/2026 3:29:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0519614
PE
1921 - HMBP-Regular-Primary Location
FACILITY_ID
FA0009414
FACILITY_NAME
SILVA TRUCKING
STREET_NUMBER
36
Direction
W
STREET_NAME
MATHEWS
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19317002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
36 W MATHEWS RD FRENCH CAMP 95231
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidat-d Emergency Response/Contingency Plan—Page 4 of 4 Rev.06/27/11 <br /> H. EARTHQUAKE VULNERABILITY <br /> Identify areas of the fa-iliry that are vulnerable to hazardous materials releases/spills due to earthquake-related motion.These areas require immediate isolation and <br /> inspection. <br /> VULNERABLE AREAS:(Check all that apply) Ht• ' LOCATIONS(e.g.,shop,outdoor shed,forensic lab) <br /> I.HAZARDOUS MATERIALS/WASTE STORAGE AREA shop H2. <br /> ❑ 2.PROCESS LINES/PIPING H3. <br /> ❑ 3.LABORATORY Ha <br /> ❑ 4.WASTE TREA I MENT AREA I Hs. <br /> Identify mechanical systems vulnerable to releases/spills due to earthquake-related motion.These systems require immediate isolation and inspection. <br /> VULNERABLE SYSTEMS:(Check all that apply) H6. LOCATIONS <br /> n 1.SHELVES,CABINETS AND RACKS I shop H7. <br /> ❑x 2.TANKS(EMER',ENCY SHUTOFF) (shop,yard H. <br /> x 3.PORTABLE GAS CYLINDERS shop H9. <br /> ❑x 4.EMERGENCY SHUTOFF AND/OR UTILITY VALVES shop,office H10. <br /> ❑ 5.SPRINKLER SYSTEMS Hit. <br /> ❑ 6.STATIONARY:'RESSURIZED CONTAINERS(e.g.,Propane dispensing tank) 1412. <br /> I. EMPLOYEE TRAINING <br /> Explanation of Requirement:Employee training is required for all employees handling hazardous materials and hazardous wastes in day-to-day or clean-up operations <br /> including volunteers ar,/or contractors.Training must be: <br /> • Provided within 6 months for new hires; <br /> • Amended as necessary prior to change in process or work assignment; <br /> • Given upon moditirution to the Emergency Response/Contingency Plan,and updated/refreshed annually for all employees. <br /> Required content includes all of the following: <br /> • Material Safety Data Sheets; • Communication and alarm systems; <br /> • Hazard communication related to health and safety; • Personal protective equipment; <br /> • Methods for safe handling of hazardous substances; • Use of emergency response equipment(e.g.Fire extinguishers,respirators, <br /> • Fire hazards of materials/processes; etc.); <br /> • Conditions likely to worsen emergencies; • Decontamination procedures; <br /> • Coordination of eme:•envy response; • Evacuation procedures; <br /> • Notification proved: :s; • Control and containment procedures; <br /> • Applicable laws and!e lations• • UST monitoring system equipment and procedures(if applicable). <br /> INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED(Check all that apply) <br /> x❑1. FORMAL CLA.SROOM; ©2. VIDEOS; ©3.SAFETY/TAILGATE MEETINGS; <br /> ❑4. STUDY GUIDES/MANUALS(Specify): 12. <br /> ❑5. OTHER(Specify): 13. <br /> ❑6. NOT APPLICABLE BECAUSE FACILITY HAS NO EMPLOYEES <br /> Large Quantity Generator(LQG)Training Records: Large quantity hazardous waste generators (i.e., who generate more than 270 gallons/1,000 kilograms of <br /> hazardous waste per month)must retain written documentation of employee hazardous waste management training sessions which includes: <br /> • A written outline/ag-nda of the type and amount of both introductory and continuing training that will be given to persons filling each job position having <br /> responsibility for the wanagement of hazardous waste(e.g.,labeling,manifesting,compliance with accumulation time limits,etc.). <br /> • The name,job talq,and date of training for each.hazardous waste management training session given to an employee filling such ajob position;and <br /> • A written job description for each of the Above job positions that describes job duties and the skills,education,or other qualifications required of personnel assigned <br /> to the position. <br /> • Current employee training records must be retained until closure ofthe facility. <br /> • Former employee train-ng records must be retained at least three years after termination of em to ment. <br /> J. LIST OF ATTACHMENTS <br /> (Check one of the follm mg) .n. <br /> ❑x 1. NO ATTACHML-.NTS ARE REQUIRED;or <br /> ❑2. THE FOLL0M'1,1G DOCUMENTS ARE ATTACHED: 32. <br /> K. SIGNATURE/CERTIFICATION <br /> Certification: Based on my inquiry of those individuals responsible for obtaining the information,I certify under penalty of law that 1 have personally examined and <br /> am familiar with the information submitted and believe the information is true,accurate,and complete,and that a copy is available on site. <br /> SIGNAT OF O\X'NLR/. E TOR DATE SIGNED K1. <br /> 3/24/2015 <br /> NAM OF SIGNER(print) K2 TITLE OF SIGNER x3. <br /> Rene Schmidt_ General Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.