My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601188_SSCR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLARKSDALE
>
4915
>
2600 - Land Use Program
>
SU-2601188_SSCR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2026 2:47:48 PM
Creation date
4/10/2026 2:21:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCR
RECORD_ID
SU-2601188
PE
2603 - SURFACE AND SUBSURFACE CONTAMINATION REPORT REVIEW
STREET_NUMBER
4915
Direction
E
STREET_NAME
CLARKSDALE
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
01709059
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4915 E CLARKSDALE RD ACAMPO 95220
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUE Program Standards Compendium Volume 3 <br /> Restricted Materials and Permitting <br /> Guidance for 1,3-D Enforcement, Continued <br /> Field 3 CCR section 6448.2(d)specifies that 1,3-D fumigations must be made using <br /> Fumigation only the methods specified in"1,3-Dichloropropene Field Fumigation <br /> Methods Requirements, rev. January 1,2026,"and it specifies several new methods <br /> with new field fumigation method(FFM)codes. Methods not specified are no <br /> longer allowed(FFM code 1290). <br /> Notice of intent In addition to the information required in 3 CCR section 6434, the following <br /> (NO]) information should be included on the NOI to aid in documenting the <br /> applicable buffer zone requirements: <br /> 1. The crop to be planted following the fumigation. <br /> 2. Whether a buffer zone is required by the"1,3-Dichloropropene Field <br /> Fumigation Requirements,rev. January 1, 2026" document, <br /> incorporated by reference into 3 CCR section 6448(d). <br /> 1,3-D use 3 CCR section 6626(g)(1)requires 1,3-D use reports to be submitted <br /> reporting electronically in a manner specified by the Commissioner. Commissioners <br /> should specify to submit use-reports through Telus. <br /> Example The following is an example for determining setbacks for overlapping <br /> setbacks for applications as specified in 3 CCR section 6448(c). <br /> overlapping <br /> applications Field 1 Application Block: Fumigation method 1206 (Table 1,Field <br /> Fumigation Requirements document), untarped, 18-inch injection <br /> — 10 acres <br /> — 3001bs./ac application rate <br /> — Fumigation starts on October 31 at 7:00 am and ends at 11:00 am <br /> — 200 ft setback(Table 3a) <br /> Field 2 Application Block: Fumigation method 1224 (Table 1,Field <br /> Fumigation Requirements document), untarped, 24-inch injection <br /> - 5 acres <br /> - 332 lbs./ac application rate <br /> - Fumigation starts on November 2, 8:00 am <br /> - 100 ft setback (Table 5b, Field Fumigation Requirements document) <br /> The applications for Blocks 1 and 2 overlap if they are separated by 300 ft <br /> (200 ft+ 100 ft) or less AND the fumigation for Block 2 starts on November <br /> 1 at 11:00 pm(October 31, 11:00 am+36 hrs.)or earlier. <br /> Continued on next page <br /> J-10 <br /> Appendix J—1,3-Dichloropropene(Field Soil Fumigation) <br /> Recommended Permit Conditions and Enforcement Guidance(10-07-2025) <br />
The URL can be used to link to this page
Your browser does not support the video tag.