Laserfiche WebLink
• At least 15 feet for 200 holes in no more than 1 acre <br /> This recommended minimum spacing does not need to be achieved for each <br /> tree hole but should be achieved for the majority of tree holes, particularly <br /> near the borders of an orchard. <br /> A separation of 51 feet between tree holes (i.e., minimum distance for no <br /> overlapping buffer zones) is likely insufficient separation between application <br /> blocks for this permit condition. The required buffer zone of 25 feet may not <br /> provide adequate protection if multiple application blocks within a single <br /> orchard (or adjacent orchards) are fumigated with less than 36-hour <br /> separation. CAC staff should consult with DPR before allowing these types of <br /> fumigations. <br /> For products containing methyl bromide and chloropicrin, the application is <br /> limited to 1 acre. <br /> Overlapping If buffer zones for two or more applications overlap within 36 hours from the <br /> buffer zones time the earlier application is complete until the start of the later application, <br /> certain restrictions apply based on the type of tarpaulin used (if any). Labels <br /> require a minimum of 12 hours to elapse from the time the earlier <br /> application(s) is complete until the start of the later application. An <br /> application block is the area of a field treated in a 24-hour period. <br /> The following are additional restrictions when application block buffer zones <br /> overlap within the first 36 hours: <br /> Scenario 1: All application blocks use TIF. <br /> TIF conditions: <br /> • Combined TIF acreage shall not exceed 60 acres. <br /> • Buffer distance for each TIF block shall be based on individual <br /> method,application rate, and acres. <br /> Scenario 1 example: <br /> Coastal county,two applications,both blocks use TIF. <br /> Block 1: Block 2: <br /> •TIF •TIF <br /> • Broadcast shank •Drip <br /> • 200 lbs.Al/ac 41150 lbs. Al/ac <br /> • 10 ac .20 ac <br /> Buffer zone determination: <br /> Combined TIF acreage is less than 60 ac(10+20=30). <br /> K-3 <br /> Appendix K—Chloropicrin and Chloropicrin in Combination with Other Products <br /> (Field Fumigant)Recommended Permit Conditions(REV.9-13-2023) <br />