My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
1900 - Hazardous Materials Program
>
PR0520265
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 1:15:49 PM
Creation date
4/13/2026 1:12:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0520265
PE
1921 - HMBP-Regular-Primary Location
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
4405 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.O <br /> �3 w'r�� <br /> d 5tot.age ?aa��< <br /> Undergr°��° <br /> tOr �I Tankecteon RoPol-t <br /> LIST op - t-e <br /> --- j Date last <br /> Designated Yas No NA <br /> performed <br />:0 4INTE A(�(C,E --" 6113124 <br /> the past [] I <br />:I 1t7. TESTING AND M. _ mpleted wlthln <br /> ___ -- �5 <br />` —s stem certification been _ -_ ___....__ -- ---sr13r2a <br /> Has monitoring Y _- H ❑ I <br /> 12 months? --- -leted within the past i -- - - G�05 ctio.% <br /> I <br /> Has spill container testing been comp _ - ____- - 6/13124 `��ype IZp2� <br /> _ ❑ <br /> 12 months? ----------- - f feted Within Q i i Ip2 <br /> Has overfill prevention equipment inspection been comp q0 <br /> lthe past 36 months? o ast 8/24124 <br /> Has secondary containment testing been completed within th. P [� (� ❑ <br /> �36 months? ----- --- ❑ ❑ NIA <br /> Has tank tightness testing been completed within required <br /> timefram N/A <br /> es? _ ---�-----� -- <br /> __ ------- — : <br /> Has line tightness testing been corrtp[eted within the required ❑ ❑ H <br /> s, <br /> timeframes? ------ --- = N/A <br /> Other Test/Maintenance: ' <br /> Other Test/Maintenance: --------J _- -_ -___-- _13 ❑ H i N/A <br /> Other Test I Maintenance- ❑ ❑ f <br /> 49. FACILITY EMPLOYEE TRAi#�ING --- ------ _- _- -- ---- _ i Yes No <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 onths? - � � �m � <br /> 13_ COMMENTS - -- ------- -- ---------This section may be used to record comments or observations-that are not current compliance <br /> deficiencies. <br /> 1. No priority alarms since previous inspection. <br /> ;2. No sump alarms since previous inspection. <br /> 3. Initial Overfill prevention testing completed on 6/13124. Passing retest completed on 7/26/24. <br /> 4. Initial secondary containment testing completed on 6/24/24. Retest completed on 10/4/24. Site has 30 days to place <br /> ;passing retest results on site. <br /> 5, Employee trained on 10/29/24. See attached employee training roster. <br /> t <br /> i <br /> I <br /> I <br /> ------------------- <br /> AIl answers marked "No"must be described by the designated UST operator in Section 3. I <br />
The URL can be used to link to this page
Your browser does not support the video tag.