My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
7735
>
1900 - Hazardous Materials Program
>
PR0520310
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2026 1:31:42 PM
Creation date
4/13/2026 1:26:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0520310
PE
1921 - HMBP-Regular-Primary Location
FACILITY_ID
FA0010422
FACILITY_NAME
FRESH INNOVATIONS CALIFORNIA
STREET_NUMBER
7735
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17726014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
7735 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1�AA <br /> INNOVnriotis <br /> DATE: 8/6/2024 SITUATION: Evacuation Drill LOCATION: Stockton, Ca <br /> PLANT: Fresh Innovations California <br /> SHIFT: 1st TIME: 1:04pm NOTE TAKER: Imelda Fernandez <br /> REVIEWED BY: SIGNATURE: DATE: <br /> OBSERVATIONS: <br /> 1. Alarm sounded off in one area only. (Is this set for specific areas or should alarm sound <br /> in whole warehouse)? <br /> 2. Windsock was blowing East upon evacuation, wind was strong and direction would <br /> change constantly. <br /> 3.(2) Associates did not hear the alarm; <br /> a. Production associate was in the Filters area and did not hear the alarm. No other <br /> associates made him aware of drill. Assistant Prod. Mgr, Jose went back in <br /> building to look for associate. <br /> b. Groundskeeper forklift operator did not hear alarm, need to create a process <br /> to notifiy associates assigned to outside work. <br /> 4. Some associates were using non-emergency doors vs emergency exits; were not <br /> following Leads who were directing associates out to path to exits. <br /> 5. Bullhorn's were not used during drill - feedback provided - need training how to use <br /> and phrase to use when alerting associates. <br /> 6. Warehouse restrooms and lunchroom cleared, shipping restroom was not checked for <br /> associates/truck drivers. <br /> 7. Visitor log was not checked to verify contractors on-site. <br /> 8. Lead had daily manifest and stated he checked all associates assigned to his line, he <br /> did not check off name and stated he did a visual check in. <br /> 9. Bagger operators hesitated to evacuate; instead trying to turn off machines. <br /> 10. Should there be a portal First Aid Kit handy to take outside if needed? <br /> 11. Training of evacuation drill and review newly updated MAPS. <br /> 12. Outside contractor was alerted; he proceeded to stick around and chat vs evacuating. <br /> 13: Start time of drill: 1 :04pm, End time of drill: 1:10pm, all associates accounted for at <br /> end time of drill. <br /> 14. Weather was 102 degrees. <br />
The URL can be used to link to this page
Your browser does not support the video tag.