Laserfiche WebLink
LAWTF CLOSURE COST ESTIMATE FORM <br /> DESCRIPTION QUANTITY UNITS COST PER TOTAL <br /> (gallons,pounds,typeof UNIT COST <br /> A. Cost for removal/disposal/treatment of: <br /> 1.Wastein containers 1 Roll-off Container $ 7,800.00 $ 7,800.00 <br /> 2.Waste in tanks $ - <br /> 3.Wash water/residue from closure activities 2 250-gal totes $ 3,000.00 $ 6,000.00 <br /> 4.Other wastes $ - <br /> Su Not al: $ 13,800.00 <br /> B. Costsfor removal/disposal/treatment of: <br /> 1.Containers 2 Roll-off bins $ 1,000.00 $ 2,000.00 <br /> 2.Tanks $ - <br /> 3.Ancillary equipment Fi I ter press,pi ping,val ves, <br /> 1 etc. $ 11,000.00 $ 11,000.00 <br /> 4.Structures/buildings $ - <br /> Subtotal: $ 13,000.00 <br /> C. Decontamination oostsof: <br /> 1.Containers <br /> 2.Tanks <br /> 3.Ancillary equipment <br /> 4.Structures/buildings <br /> 5.Additional equipment <br /> 6.Removal/disposal of wastewater from decon. <br /> Subtotal: included in pricing above. <br /> D. Transportation costsof: <br /> 1.Wastesfrom containers <br /> 2.Wastes from tanks <br /> 3.Tanks and containers <br /> 4.Structures/buildings/equipment <br /> Subtotal: included in pricing above. <br /> E. Sampling costs(QC soil and wipesamples) <br /> 1.Containers <br /> 2.Tanks <br /> 3.Ancillary equipment <br /> 4.Structures/buildings <br /> 5.Soil(coring and labor) <br /> 6.Wash water/resi due from closure activities <br /> Subtotal: included in pricing above. <br /> F. Closure Certification Costs <br /> 1.Preparation of certification(clerical) 8 hours $ 75.00 $ 600.00 <br /> 2.Preparation of certification by RE 4 hours $ 150.00 $ 600.00 <br /> 3.Inspection by Certified P.E. 2 hours $ 150.00 $ 300.00 <br /> 4.Review by Certified P.E. 1 hours $ 150.00 $ 150.00 <br /> Subtotal: $ 1,650.00 <br /> G. Other Costs <br /> 1.Contingency-20% <br /> $ 5,690.00 <br /> Subtotal: $ 5,690.00 <br /> Sim of Parts A,B,C,D,E,F& G: $ 34,140.00 <br /> H. Salvagevalueof facility structures,equipment,land,etc.(attach detailed Amount: <br /> information) <br /> Subtract thevalueof H from the Sum of parts A, B,C, D, E, F Total Closure Costs: $ 34,140.00 <br /> & G <br />