My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
1900 - Hazardous Materials Program
>
PR0520624
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2026 9:51:09 AM
Creation date
4/19/2026 9:44:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0520624
PE
1921 - HMBP-Regular-Primary Location
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
Stockton
Zip
95203
APN
16103002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
3515 Navy DR Stockton 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 Annual Inspection Checklist <br /> General Inspection Information: <br /> E <br /> ection Date: 3�2/IZf� Retain Until Date: 3 2/ 12- (36 months from inspection date) <br /> ection Date: C Inspector Name:.ected(ID#'s): <br /> Inspection Guidance: <br /> ➢ For equipment not included in this Standard,followthe manufacturer recommended inspection/testing schedules and procedures. <br /> ➢ The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified <br /> Inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> ➢ Remove promptly upon discovery standing water or liquid in the primary tank,secondary containment area,interstice, or spill container.Before discharge to the <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> ➢ In order to comply with EPA SPCC (Spill Prevention,Control and Countermeasure)rules,a facility must regularly test liquid level sensing devices to ensure proper <br /> operation(4D CFR 112.8(c)(8)(v)). <br /> ➢ (*)designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> ➢ Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design,a Certified Inspector,or a tank <br /> manufacturer who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> ➢ Retain the completed checklists for 36 months. <br /> ➢ Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> ➢ Note:If a change has occurred to the tank system or containment that may affect the SPCC plan,the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation. <br /> Item I Task Status Comments <br /> 1.0 Tank Containment 11 <br /> 1.1 Containment Check for: ❑Yes" ❑ No N/A <br /> structure . Holes or cracks in <br /> containment wall <br /> or floor <br /> • Washout <br /> • Liner degradation <br /> • Corrosion <br /> • Leakage <br /> • Paint failure <br /> • Tank settling <br /> 2.0 Tank Foundation and Supports <br /> 2.1 Foundation Settlement or es ❑ No <br /> foundation washout? <br /> 2.2 Concrefe pad Cracking or spalling? ❑Yes* No ❑ N/A <br /> or ring wall <br /> SEPTEMBER 2011 <br /> AST INSPECTION STANDARD ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.