My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
1900 - Hazardous Materials Program
>
PR0520624
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2026 9:51:09 AM
Creation date
4/19/2026 9:44:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0520624
PE
1921 - HMBP-Regular-Primary Location
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
Stockton
Zip
95203
APN
16103002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
3515 Navy DR Stockton 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> STI SpOO1 Monthly Inspection Checklist <br /> EGeneralpection Information: (36 months from inspection date) <br /> Z Retain Until Date:Date:Date: ( l Z�� Inspector Name:(ID#'s): N <br /> Inspection Guidance: <br /> 3> For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> tainmen <br /> ➢ The periodic AST Inspection is intended for monitoring the external is famiAST <br /> w th the condition to and d its co identify changes and developing problems.t structure.This visual does not require a Certified <br /> Inspector. It shall be performed by an owner's inspectorspill container, remove <br /> ➢ Upon discovery of water in the primary tank, se onda regulated containment <br /> producarea, ince ctice, or <br /> rnants and disposed of itppr petrtyor take other corrective action.Before <br /> discharge to the environment, inspect the q g <br /> ➢ (*)designates an item in anon-conformance status.This indicates that action is required to address a problem. <br /> ➢ Non-conforming items important to tank or containmenNotephe non-conformance evaluation <br /> mance and coreregpondingineer corrective rla con in design,the commenitlsectiopector,or a tank <br /> manufacturer who will determine the corrective action. <br /> ➢ Retain the completed checklists for 36 months. could affect the <br /> enance nents <br /> ➢ In the event of severe weather(snow, ice, <br /> hind storms) <br /> )or thesent <br /> (such <br /> s required as s on as the equipment ps safely accessible after event. <br /> (normal and emergency vents, valves), p i <br /> Comments <br /> Item Task Status <br /> 1.0 Tank Containment <br /> 1.1Containment Check for water, <br /> structure debris, cracks or fire Yes* ❑ No %,N/A <br /> hazard <br /> 1.2 Primary tank Check for water ❑Yes* No <br /> 1.3 Containment Operable and in a ❑Yes ❑ No* >CN/A <br /> drain valves closed position <br /> 1.4 Pathways and Clear and KY El ElNo* El N/A <br /> entry gates/doors <br /> operable <br /> 2.0 Leak Detection <br /> 2.1 Tank Visible signs of ❑Yes* t No <br /> leakage <br /> 2.2 Secondary Visible signs of <br /> Containment leakage from tank ❑Yes* )(No <br /> into secondary <br /> containment <br /> 2.3 Surrounding soil Visible signs of ❑Yes* No ❑ N/A <br /> leaka e <br /> 2.4 Interstice Visible signs of []Yes* Y No ❑ N/A <br /> leakage SEPTEMBER 201 <br /> AST INSPECTION STANDARD <br />
The URL can be used to link to this page
Your browser does not support the video tag.