Laserfiche WebLink
1 <br /> STI SpOO1 Monthly Inspection Checklist <br /> EGeneralpection Information: (36 months from inspection date) <br /> Z Retain Until Date:Date:Date: ( l Z�� Inspector Name:(ID#'s): N <br /> Inspection Guidance: <br /> 3> For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> tainmen <br /> ➢ The periodic AST Inspection is intended for monitoring the external is famiAST <br /> w th the condition to and d its co identify changes and developing problems.t structure.This visual does not require a Certified <br /> Inspector. It shall be performed by an owner's inspectorspill container, remove <br /> ➢ Upon discovery of water in the primary tank, se onda regulated containment <br /> producarea, ince ctice, or <br /> rnants and disposed of itppr petrtyor take other corrective action.Before <br /> discharge to the environment, inspect the q g <br /> ➢ (*)designates an item in anon-conformance status.This indicates that action is required to address a problem. <br /> ➢ Non-conforming items important to tank or containmenNotephe non-conformance evaluation <br /> mance and coreregpondingineer corrective rla con in design,the commenitlsectiopector,or a tank <br /> manufacturer who will determine the corrective action. <br /> ➢ Retain the completed checklists for 36 months. could affect the <br /> enance nents <br /> ➢ In the event of severe weather(snow, ice, <br /> hind storms) <br /> )or thesent <br /> (such <br /> s required as s on as the equipment ps safely accessible after event. <br /> (normal and emergency vents, valves), p i <br /> Comments <br /> Item Task Status <br /> 1.0 Tank Containment <br /> 1.1Containment Check for water, <br /> structure debris, cracks or fire Yes* ❑ No %,N/A <br /> hazard <br /> 1.2 Primary tank Check for water ❑Yes* No <br /> 1.3 Containment Operable and in a ❑Yes ❑ No* >CN/A <br /> drain valves closed position <br /> 1.4 Pathways and Clear and KY El ElNo* El N/A <br /> entry gates/doors <br /> operable <br /> 2.0 Leak Detection <br /> 2.1 Tank Visible signs of ❑Yes* t No <br /> leakage <br /> 2.2 Secondary Visible signs of <br /> Containment leakage from tank ❑Yes* )(No <br /> into secondary <br /> containment <br /> 2.3 Surrounding soil Visible signs of ❑Yes* No ❑ N/A <br /> leaka e <br /> 2.4 Interstice Visible signs of []Yes* Y No ❑ N/A <br /> leakage SEPTEMBER 201 <br /> AST INSPECTION STANDARD <br />