My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
1900 - Hazardous Materials Program
>
PR0520624
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2026 9:51:09 AM
Creation date
4/19/2026 9:44:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0520624
PE
1921 - HMBP-Regular-Primary Location
FACILITY_ID
FA0003747
FACILITY_NAME
Shell Oil Products US - Stockton Terminal
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
Stockton
Zip
95203
APN
16103002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
3515 Navy DR Stockton 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Comments <br /> Item <br /> Task Status <br /> 3.0 Tank Equipment <br /> 3.1 Valves a.Check for leaks. ❑Yes' No ❑ NIA <br /> b.Tank drain valves Oyes* No ❑ N/A <br /> must be kept locked. <br /> 3.2 Spill a. Inspect for debris, <br /> containment residue, and water in ❑Yes* ❑ No 4u <br /> boxes on fill the box and remove. <br /> pipe b.Drain valves must <br /> be operable and ❑Yes* [I No IN/A <br /> closed. <br /> 3.3 Liquid level a.Both visual and <br /> equipment mechanical devices C 'es ❑ No* ❑ N/A <br /> must be inspected <br /> for physical damage. <br /> b. Check that the <br /> device is easily �Yes ❑ No* ❑ N/A <br /> readable <br /> 3.4 Overfill a. If equipped with a <br /> equipment "test"button, <br /> activate the audible <br /> horn or light to ❑Yes ❑ No* NIA <br /> confirm operation. <br /> This could be battery <br /> powered. Replace <br /> the battery if needed <br /> b. If overfili valve is <br /> equipped with a <br /> mechanical test ❑Yes ❑ No* C N/A <br /> mechanism,actuate <br /> the mechanism to <br /> confirm o eration. <br /> 3.5 Piping Check for leaks, ,/ <br /> connections corrosion and �es*1114`No <br /> damage <br /> 4.0 Tank Attachments and Appurtenances <br /> 4.1 Ladder and Secure with no sign <br /> platform of severe corrosion 41es ❑ No* ❑ N/A <br /> structure or damage? <br /> 5.0 Other Conditions <br /> 5.1 Are there other conditions that should I <br /> be addressed for continued safe ❑Yes* No <br /> operation or that may affect the site spill <br /> prevention plan? <br /> SEPTEMBER 2011 <br /> AST INSPECTION STANDARD <br />
The URL can be used to link to this page
Your browser does not support the video tag.