Laserfiche WebLink
STI SP00'f Monthly Inspection Checkiist <br /> General Inspection Information: <br /> Inspection Date: 9 1,012q Retain Until Date:_ �9 APZ 7 <br /> (36 months from inspection date) <br /> Prior Inspection Date: 8lZ�2 inspector Name: _ M C.C-%� 6&eyov <br /> Tanks inspected(ID#s): /Anm— q 7 <br /> Inspection Guidance: <br /> ➢ For equipment not included in this Standard,follow the manufacturer recommended inspection/testing schedules and procedures. <br /> A The periodic AST inspection is intended for monitoring the external AST condition and its containment structure.This visual inspection does not require a Certified <br /> inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems. <br /> Upon discovery of water in the primary tank,secondary containment area,interstice,or spill container, remove promptly or take other corrective action. Before <br /> discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it properly, <br /> (*)designates an item in a non-conformance status.This indicates that action is required to address a problem. <br /> ➢ Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design; a Certified Inspector,or a tank <br /> manufacturer who will determine the corrective action.Note the non-conformance and corresponding corrective action in the comment section. <br /> ➢ Retain the completed checklists for 36 months, <br /> In the event of severe weather(snow,ice,windstorms) or maintenance (such as painting) that could affect the operation of critical components <br /> (normal and emergency vents,valves),an inspection of these components is required as soon as the equipment is safely accessible after the event. <br /> Item Task Status <br /> 1.0 Tank Containment Comments <br /> 1.1 Containment Check for wafter, <br /> structure debris, cracks or fire ®Yes* ❑ No L? N/A <br /> hazard i <br /> 1.2 Primary tank Check for water []Yes* No <br /> 1.3 Containment Operable and in a <br /> drain valves closed position ❑Yes ❑ No* �KN/A <br /> 1.4 Pathways and Clear and --// <br /> entry gates/doors J7JYes ❑ No* ❑ N/A <br /> 2.0 L.eakDetection o enable <br /> 2.1 Tank Visible signs of <br /> leakage ❑Yes* No <br /> 2.2 Secondary Visible signs of <br /> Containment leakage from tankou 5gatwJ_ J <br /> into secondary [:]Yes* f"No <br /> containment <br /> 2,3 Surrounding soil Visible signs of <br /> leaka e ❑Yes" iO No ❑ N/A <br /> 2.4 Interstice Visible signs of <br /> leakage ❑Yes* ❑ No N/A <br /> AST INSPECTION STANDARD <br /> SEPTEMBER 2011 <br />