My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AP2400573 (4)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TOWNE CENTRE
>
390
>
2900 - Site Mitigation Program
>
AP2400573 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 2:33:32 PM
Creation date
4/22/2026 1:26:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
AP2400573
PE
2903 - WORKPLAN/REPORT PLAN CHECK - OTHER AGENCY
FACILITY_NAME
CITY OF LATHROP PUBLIC WORKS
STREET_NUMBER
390
STREET_NAME
TOWNE CENTRE
City
LATHROP
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
390 TOWNE CENTRE LATHROP
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
828
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
an EXPLANATION <br /> North of <br /> MW-N1 Central Lathrop City of Lathrop Monitoring Well <br /> ■ <br /> Specific Plan • Functional <br /> MW-N2 NMW-2 <br /> ■ 0 0 o D ry <br /> NMW-3 NMW-1 <br /> M:N3 • O Damaged <br /> MW-N4 MW-N6 <br /> • MW-N5 ■ X Abandoned <br /> ■NMW- Presumed Abandoned <br /> v <br /> ° Lost, Presumed Destroyed <br /> NMW-5 Central Lathrop Unknown, access granted but <br /> ■ Specific Plan An ■ insufficient time for field visit <br /> LSP-9 CLSP-10 <br /> O 0 ° <br /> Unknown, access denied <br /> CLSP-1 t <br /> �r • CLSP-2 <br /> Q� o Existing Storage Pond <br /> cc <br /> :LSP-8 Constructed Land Application Area <br /> CLSP-7 Lathrop Rd. RMW-3 0 <br /> x <br /> CL P-5 RMW-1 0 1 2 <br /> RMW-2 • • <br /> �I CLSP-6 I I I I I I I <br /> LPG CLSP-3 X RMW-5I <br /> Miles <br /> • MWI MWR-20 MWM-25 RMW-4 Pond S6 <br /> MWM-23 <br /> MWR-10 • • MWM-26 <br /> • 0MWR-9 MWM-24 • <br /> MWR-22 M•R-8 \ MWM-22 0 WM�21 <br /> MWR-30 • MW:-20 C�P-4 Louise Ave. KMW-6 <br /> • KMW-9 <br /> • <br /> MWR-29 _ MWM-17 MWM-19 • <br /> / MWR-28 'MWR-27 Mossdale MWM-16• • }MW;-18 ` KM:-8 <br /> / <br /> MW:32 • MWR-7 MWM-14•• MWM-15 MWM-12 KMW-2 <br /> \ • <br /> / MWR-12 • c MWM-27 • • •MWM-13 KMW-5 <br /> • \ MWR-6 MWR-19 \\ MWM-11 X KMW-10• KM:-4 <br /> MWR-11 \ ♦ MWM-10 MWM-7 MWM-8 <br /> P / See insert A <br /> aNadZse River Islands MWR-13 X MWR-2 MWM-6• • C OM <br /> • • • KMW-3 KMW 7 MBRMW-4 <br /> WR-14 \O ` �WR-16 MWM�IZMWM 5 • X X-• • KMW-1: <br /> MWR-5 ` MWM-2• F4 X <br /> • MWM-3 -C KMW-1 X <br /> • y MBRMW-1 <br /> MWR-18 MWM-1 Consolidated ,�'" <br /> MWR-4 Treatment MBRMW-3 <br /> • ; � Facilit / MW-3 �\� \W_4 Consolidated <br /> MW-S2 Crossroads y MW 5•� MW-4 MBRMW-2 Treatment <br /> WWTF� " <br /> MWR-0 MWR_:MMWR-26 x R 1•MWR-17 MW-S1 0MW-S3 W-3 MW'2 Facility <br /> kt ( MW-S5 l20 MW-1- W-2 <br /> MWR-25• •MWR\24 MW-S4 VV-1 Crossroads <br /> k • outh Lathrop WWTF <br /> MWR-23 Specific Plan Insert A <br /> HYDR4FOCUS= Location and Status of Monitoring Wells. Figure <br /> 1 <br /> PROJECT: 5070-2 DATE: 1/25/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.