My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2026 12:26:05 PM
Creation date
4/29/2026 2:20:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231097
PE
2361 - UST FACILITY
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1932 EL PINAL DR STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN aOAQUIN Environmental Health Department <br /> COUNTY— <br /> Greatness grows here. <br /> CP26 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> SUSD-CORPORATE YARD 11932 EL PINAL DR STOCKTON May 5 2026 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I, CLASS II, or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 40 23 CCR 16 2613(e) 2011002 - Installation, repair, lining, integrity, calibration, and release records maintained for life of <br /> UST <br /> OBSERVATION: Records of installation, repairs, linings, intregrity certification, and/or unauthorized release reports were <br /> not kept onsite, or offsite if approved by the UPA, for the life of the UST. Tank charts were observed on site. <br /> REGULATION GUIDANCE: § 2613(e)The following records must be maintained by the owner or operator on site, or off <br /> site at a readily accessible location if approved by the Unified Program Agency, for the life of the underground storage <br /> tank system: (1) Installation records including, but not limited to: (A)Installation test results; (B)Manufacturer checklists <br /> and manuals; and (C)As-built drawings. (2) Records of repairs, including inspection reports and structural integrity <br /> certifications associated with interior lining; (3)Tank calibration charts; and (4) Unauthorized release reports. <br /> CORRECTIVE ACTION: Immediately locate and maintain these records onsite and submit copies to the UPA within 30 <br /> days. <br /> This is a (Minor)Violation. <br /> 44 23 CCR 16 2643(c) and (d); HSC 6.7 25288 2031031 - Facility has corrected all previously cited violations <br /> OBSERVATION:OBSERVATION: An inspection was last done on 6/11/2025 and an inspection report was issued <br /> identifying information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 7/11/2025. This information was initially received on 7/16/2025, 5 days late to close some violations and on 4/13/2026 to <br /> close the rest of the violations, 275 days late. <br /> REGULATION GUIDANCE: HSC 25404.1.2 (c) (1)A person who receives a notice to comply detailing a minor violation <br /> shall have not more than 30 days from the date of the notice to comply in which to correct any violation cited in the notice <br /> to comply. Within five working days of correcting the violation, the person cited or an authorized representative shall sign <br /> the notice to comply, certifying that any violation has been corrected, and return the notice to the UPA.HSC 25288 (d) <br /> Within 60 days after receiving a compliance report or special inspection report prepared in accordance with subdivision <br /> (b) or(c), respectively, the permitholder shall file with the local agency a plan to implement all recommendations <br /> contained in the compliance report or shall demonstrate, to the satisfaction of the local agency, why these <br /> recommendations should not be implemented. Any corrective action conducted pursuant to the recommendations in the <br /> report shall be taken pursuant to Sections 25296.10 and 25299.36. <br /> CORRECTIVE ACTION: Ensure all violations cited on the inspection report provided by the UPA or special inspector are <br /> corrected within 30 days for minor violatoins and 60 days for all other violations. <br /> This is a Repeat (Class 2)Violation. <br /> EHD-CUPA Inspection Report IS03 Page 4 of 5 FA0004016 PR0231097 4644810 5/5/2026 <br /> CP26-U aST FULL g <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.