Laserfiche WebLink
SA I l 4A A� � I Environmental Health Department <br /> COUNTY I <br /> UST SYSTEM RETROFIT OR REPAIR <br /> 1. Site map enclosed? YES [] NO [X] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the "Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely plan review):_Replace Veeder Root <br /> Tank 1 409 sensor. Replace Veeder Root Tank PLLD. Test sensor functionality. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): _1 - <br /> Veeder Root 409 Sensor 1 -Veeder PLLD <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES [] NO [X] <br /> b. Identify contractor performing decontamination: <br /> Name Phone ( ) <br /> Address City Zip <br /> 4of6 <br />